Learn more →Water Main Replacement project generally includes the furnishing of all labor, materials, equipment, and incidentals necessary to complete the installation of approx 2,830 LF of new water main infrastructure. The project consists of 430 LF of 16" diameter ductile iron pipe (DIP) with nitrile gaskets, 20 LF of 16" diameter DIP with a 24" diameter casing pipe, 2,300 LF of 16" diameter polyvinyl chloride (PVC) pipe, 60 LF of 8" diameter PVC Pipe, and 20 LF of 12" diameter PVC pipe. Work shall include, but is not limited to, trench excavation and backfill, pipe installation, installation of valves, fittings, hydrants, restrained joints, thrust restraints, air release valves and pits, connections to existing mains, flushing, pressure testing, disinfection, and surface restoration.
Posted Date
Dec 1, 2025
Due Date
Jan 13, 2026
Release: Dec 1, 2025
Close: Jan 13, 2026
Water Main Replacement project generally includes the furnishing of all labor, materials, equipment, and incidentals necessary to complete the installation of approx 2,830 LF of new water main infrastructure. The project consists of 430 LF of 16" diameter ductile iron pipe (DIP) with nitrile gaskets, 20 LF of 16" diameter DIP with a 24" diameter casing pipe, 2,300 LF of 16" diameter polyvinyl chloride (PVC) pipe, 60 LF of 8" diameter PVC Pipe, and 20 LF of 12" diameter PVC pipe. Work shall include, but is not limited to, trench excavation and backfill, pipe installation, installation of valves, fittings, hydrants, restrained joints, thrust restraints, air release valves and pits, connections to existing mains, flushing, pressure testing, disinfection, and surface restoration.
AvailableThe project will consist of installation of concrete footings, utility work, concrete retaining walls and steps, concrete pavements, large open-air shelter, architectural columns, swing structures, electrical and lighting, kit-style restroom building, finish grading, landscaping, and site restoration.
Posted Date
Nov 25, 2025
Due Date
Dec 16, 2025
Release: Nov 25, 2025
Close: Dec 16, 2025
The project will consist of installation of concrete footings, utility work, concrete retaining walls and steps, concrete pavements, large open-air shelter, architectural columns, swing structures, electrical and lighting, kit-style restroom building, finish grading, landscaping, and site restoration.
AvailableWorks include approx. 12 LF of 8" PVC DR-18 water main ,trenched; 2 EA 8" valve; 3 EA fire hydrant assembly. See outside link.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Works include approx. 12 LF of 8" PVC DR-18 water main ,trenched; 2 EA 8" valve; 3 EA fire hydrant assembly. See outside link.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis