Discover Opportunities months before the RFP drops
Learn more →The Work consists of furnishing all labor, materials, equipment, and skills, and performing all operations required for the excavation of deposited sediment in approximately 3,200 LF of drainage ditch. The Work consists of furnishing all labor, materials, equipment, and skills, and performing all operations required to construct the Work along and within the existing drainage ditch. The Work includes, but is not limited to, mobilization and demobilization; control of water to perform work; furnishing, installing, and maintaining erosion control measures, site preparation including clearing and grubbing, ditch excavation and final grading, installing one culvert, and two riprap aprons.
Posted Date
Dec 5, 2025
Due Date
Dec 23, 2025
Release: Dec 5, 2025
Close: Dec 23, 2025
The Work consists of furnishing all labor, materials, equipment, and skills, and performing all operations required for the excavation of deposited sediment in approximately 3,200 LF of drainage ditch. The Work consists of furnishing all labor, materials, equipment, and skills, and performing all operations required to construct the Work along and within the existing drainage ditch. The Work includes, but is not limited to, mobilization and demobilization; control of water to perform work; furnishing, installing, and maintaining erosion control measures, site preparation including clearing and grubbing, ditch excavation and final grading, installing one culvert, and two riprap aprons.
AvailableThe City of Farmington, MN is seeking bids for the removal of 329 ash trees, including stump removals and restoration, as part of the 2024 Shade Tree Bond Grant project. The work involves traffic control, erosion control, and related tasks, with all activities to be conducted in accordance with the Project Manual prepared by the City.
Posted Date
-
Due Date
Oct 9, 2024
Release: -
Close: Oct 9, 2024
The City of Farmington, MN is seeking bids for the removal of 329 ash trees, including stump removals and restoration, as part of the 2024 Shade Tree Bond Grant project. The work involves traffic control, erosion control, and related tasks, with all activities to be conducted in accordance with the Project Manual prepared by the City.
100 squares of fully-adhered EPDM roof system replacement.
Posted Date
Jul 24, 2025
Due Date
Aug 13, 2025
Release: Jul 24, 2025
Close: Aug 13, 2025
100 squares of fully-adhered EPDM roof system replacement.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis