Discover Opportunities months before the RFP drops
Learn more →Work to be done shall consist of providing all appurtenances and performing all labor to provide an AMR system including installation of 211 AMR meter registers and transmitters, perform service line verification via visual inspection, and install 526 L.F. of Construction Mesh Fencing. Also included within this contract is to furnish all labor and technical support associated with furnishing a laptop computer for data collection, back-up meter reading equipment, software, set-up, training, and all other appurtenances necessary to complete the project.
Posted Date
Nov 14, 2025
Due Date
Dec 18, 2025
Release: Nov 14, 2025
Close: Dec 18, 2025
Work to be done shall consist of providing all appurtenances and performing all labor to provide an AMR system including installation of 211 AMR meter registers and transmitters, perform service line verification via visual inspection, and install 526 L.F. of Construction Mesh Fencing. Also included within this contract is to furnish all labor and technical support associated with furnishing a laptop computer for data collection, back-up meter reading equipment, software, set-up, training, and all other appurtenances necessary to complete the project.
AvailableWork to be done shall consist of the construction of a permanent 550 gpm deep well and furnishing all products and performing all labor necessary to construct a chemical feed building described herein. In general, construction consists of the installation of a new deep well to the depth and diameter as required in the construction drawings and technical specifications. In general, construction shall include a chemical feed building, drilling a 26" dia. hole, installing 20" permanent casing, 75-hp vertical turbine pump, motor, valves, yard piping, painting, video-taping, logging and performing a 24-hour pump test, site work, electrical and all other appurtenances necessary to complete the work. Minimum depth is expected to be +/- 520 FT.
Posted Date
Sep 18, 2024
Due Date
Nov 1, 2024
Release: Sep 18, 2024
Close: Nov 1, 2024
Work to be done shall consist of the construction of a permanent 550 gpm deep well and furnishing all products and performing all labor necessary to construct a chemical feed building described herein. In general, construction consists of the installation of a new deep well to the depth and diameter as required in the construction drawings and technical specifications. In general, construction shall include a chemical feed building, drilling a 26" dia. hole, installing 20" permanent casing, 75-hp vertical turbine pump, motor, valves, yard piping, painting, video-taping, logging and performing a 24-hour pump test, site work, electrical and all other appurtenances necessary to complete the work. Minimum depth is expected to be +/- 520 FT.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis