Discover Opportunities months before the RFP drops
Learn more →The City of Euless is soliciting bids to remodel six bathrooms at Euless Fire Station #3, including new shower pans, flush valves, vanity tops, sinks, fixtures, tile floors, LED lighting, exhaust fans, and ADA-compliant features. Bidders must attend a mandatory pre-bid meeting on December 10, 2025 and submit proposals by December 17, 2025; work will be phased to minimize station downtime.
Posted Date
Nov 20, 2025
Due Date
Dec 17, 2025
Release: Nov 20, 2025
Close: Dec 17, 2025
The City of Euless is soliciting bids to remodel six bathrooms at Euless Fire Station #3, including new shower pans, flush valves, vanity tops, sinks, fixtures, tile floors, LED lighting, exhaust fans, and ADA-compliant features. Bidders must attend a mandatory pre-bid meeting on December 10, 2025 and submit proposals by December 17, 2025; work will be phased to minimize station downtime.
AvailableConstruct a new approx. 1,400 SF restroom and storage building with associated sidewalk paving. The building has a CMU and wood truss structure with brick veneer and metal roof
Posted Date
-
Due Date
Aug 14, 2025
Release: -
Close: Aug 14, 2025
Construct a new approx. 1,400 SF restroom and storage building with associated sidewalk paving. The building has a CMU and wood truss structure with brick veneer and metal roof
Project includes 287,602 SF of remove asphalt pavement; 43,779 SF sawcut and remove concrete pavement and flatwork; 36,603 SY 6" lime or cement treated subgrade, complete in place; 33,008 SY 8" thick reinforced concrete pavement w/ monolithic curb, complete in place; 11,135 SY 4" topsoil and sodding, complete in place; 10,599 LF sawcut and remove concrete curb and gutter; 5,577 CY unclassified excavation. See attached file for more info.
Posted Date
May 7, 2024
Due Date
Jun 6, 2024
Release: May 7, 2024
Close: Jun 6, 2024
Project includes 287,602 SF of remove asphalt pavement; 43,779 SF sawcut and remove concrete pavement and flatwork; 36,603 SY 6" lime or cement treated subgrade, complete in place; 33,008 SY 8" thick reinforced concrete pavement w/ monolithic curb, complete in place; 11,135 SY 4" topsoil and sodding, complete in place; 10,599 LF sawcut and remove concrete curb and gutter; 5,577 CY unclassified excavation. See attached file for more info.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis