Discover Opportunities months before the RFP drops
Learn more →Work consists of remove and replace existing sidewalk and parking lot paving. Remove existing planter and replace with new stormwater treatment planter. Add new accessible paths of travel and installation of electrical vehicle charging stations.
Posted Date
Dec 10, 2025
Due Date
Jan 14, 2026
Release: Dec 10, 2025
Close: Jan 14, 2026
Work consists of remove and replace existing sidewalk and parking lot paving. Remove existing planter and replace with new stormwater treatment planter. Add new accessible paths of travel and installation of electrical vehicle charging stations.
AvailableWork includes demolition of existing pool plaster and tiles to existing bare concrete shell of the competition swimming pool. Re-tile and re-plaster.
Posted Date
Nov 10, 2025
Due Date
Nov 19, 2025
Release: Nov 10, 2025
Close: Nov 19, 2025
Work includes demolition of existing pool plaster and tiles to existing bare concrete shell of the competition swimming pool. Re-tile and re-plaster.
Work includes mobilization, roadway excavation, demolition, construction of asphalt concrete pavement, cement-lime treated base, grading and drainage. Work includes, 4,800 SF of remove asphalt pavement; 4,800 SF of fine grading; 1100 LF of redwood header; 2,200 SF of seed mix; 180 TON of hot mix asphalt; 300 Lf of 6" PVC perforated.
Posted Date
-
Due Date
Aug 12, 2025
Release: -
Close: Aug 12, 2025
Work includes mobilization, roadway excavation, demolition, construction of asphalt concrete pavement, cement-lime treated base, grading and drainage. Work includes, 4,800 SF of remove asphalt pavement; 4,800 SF of fine grading; 1100 LF of redwood header; 2,200 SF of seed mix; 180 TON of hot mix asphalt; 300 Lf of 6" PVC perforated.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis