Learn more →New stormwater facilities (conveyance pipe, drainage structures and swales), curb, gutter and sidewalk, shared use path, utilities, paving, illumination, a traffic signal and restoration. All work shall be completed in accordance with the contract plans, special provisions, and approved standard specifications.
Posted Date
Dec 8, 2025
Due Date
Jan 13, 2026
Release: Dec 8, 2025
Close: Jan 13, 2026
New stormwater facilities (conveyance pipe, drainage structures and swales), curb, gutter and sidewalk, shared use path, utilities, paving, illumination, a traffic signal and restoration. All work shall be completed in accordance with the contract plans, special provisions, and approved standard specifications.
AvailableWork includes approx 1 LS precast concrete box culvert sections, wingwalls and footings. See outside link.
Posted Date
Oct 29, 2025
Due Date
Feb 9, 2026
Release: Oct 29, 2025
Close: Feb 9, 2026
Work includes approx 1 LS precast concrete box culvert sections, wingwalls and footings. See outside link.
AvailableWork to be performed includes roadway planing and paving, replacing pedestrian curb ramps, water service replacements, utility adjustments, striping, and related work.
Posted Date
Jun 5, 2025
Due Date
Jun 24, 2025
Release: Jun 5, 2025
Close: Jun 24, 2025
Work to be performed includes roadway planing and paving, replacing pedestrian curb ramps, water service replacements, utility adjustments, striping, and related work.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis