Discover Opportunities months before the RFP drops
Learn more →Installation of a traffic signal, grading, curb and gutter, HMA patching, storm sewer and intakes, sidewalks, driveways, pavement markings, signage, erosion control.
Posted Date
Dec 1, 2025
Due Date
Dec 18, 2025
Release: Dec 1, 2025
Close: Dec 18, 2025
Installation of a traffic signal, grading, curb and gutter, HMA patching, storm sewer and intakes, sidewalks, driveways, pavement markings, signage, erosion control.
AvailableThe project includes construction of approx. 18,100 SY of Portland cement concrete overlay (Whitetopping) and 710 SY of Portland cement concrete pavement, along with some excavation, pavement removal, base stone placement, and shouldering.
Posted Date
-
Due Date
Nov 25, 2025
Close: Nov 25, 2025
The project includes construction of approx. 18,100 SY of Portland cement concrete overlay (Whitetopping) and 710 SY of Portland cement concrete pavement, along with some excavation, pavement removal, base stone placement, and shouldering.
14,000 SY of 7 and 8" PCC pavement; 15,700 SY of base stone; 4,000 CY of earthwork/grading; 2,000 CY of topsoil moving; a total of 850 LF of 18 and 15" storm sewer/culverts; and related erosion and sediment control and nominal landscaping.
Posted Date
-
Due Date
Feb 25, 2025
Release: -
Close: Feb 25, 2025
14,000 SY of 7 and 8" PCC pavement; 15,700 SY of base stone; 4,000 CY of earthwork/grading; 2,000 CY of topsoil moving; a total of 850 LF of 18 and 15" storm sewer/culverts; and related erosion and sediment control and nominal landscaping.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis