Discover Opportunities months before the RFP drops
Learn more →Work will include milling, paving and striping various streets.
Posted Date
Dec 10, 2025
Due Date
Jan 14, 2026
Release: Dec 10, 2025
Close: Jan 14, 2026
Work will include milling, paving and striping various streets.
AvailableTo create an outdoor amphitheater with a 2,500-person seating capacity, along with additional parking. The project will include Sitework, Vertical Construction, and Landscaping items. The project includes two phases; the bulk of the proposed work is included in Phase 1, while Phase 2 includes additional parking. Phase 1 - Amphitheater & (87) Parking Spaces Sitework includes: clearing & grubbing, demolition, unclassified & borrow excavation, surcharge with settlement plates & hubs, retaining wall, storm sewer inlets/pipe/underdrain, water & sewer utilities, asphalt pavement, permeable paver parking, and concrete curbing/sidewalk/handicap parking. Vertical Construction includes: amphitheater stage, restrooms, and storage/utility building. Landscaping includes: primary sign feature with fountain, splash pad, plantings & irrigation, water fountains, trash receptacles, and benches. Phase 2 - (108) Parking Spaces Sitework includes: clearing & grubbing, unclassified & borrow excavation, storm sewer inlets/pipe/underdrain, asphalt pavement, permeable paver parking, and concrete curbing/sidewalk. Landscaping includes: plantings & irrigation.
Posted Date
Jul 23, 2025
Due Date
Aug 13, 2025
Release: Jul 23, 2025
Close: Aug 13, 2025
To create an outdoor amphitheater with a 2,500-person seating capacity, along with additional parking. The project will include Sitework, Vertical Construction, and Landscaping items. The project includes two phases; the bulk of the proposed work is included in Phase 1, while Phase 2 includes additional parking. Phase 1 - Amphitheater & (87) Parking Spaces Sitework includes: clearing & grubbing, demolition, unclassified & borrow excavation, surcharge with settlement plates & hubs, retaining wall, storm sewer inlets/pipe/underdrain, water & sewer utilities, asphalt pavement, permeable paver parking, and concrete curbing/sidewalk/handicap parking. Vertical Construction includes: amphitheater stage, restrooms, and storage/utility building. Landscaping includes: primary sign feature with fountain, splash pad, plantings & irrigation, water fountains, trash receptacles, and benches. Phase 2 - (108) Parking Spaces Sitework includes: clearing & grubbing, unclassified & borrow excavation, storm sewer inlets/pipe/underdrain, asphalt pavement, permeable paver parking, and concrete curbing/sidewalk. Landscaping includes: plantings & irrigation.
Provide cellular telephone service and related equipment.
Posted Date
-
Due Date
Jul 17, 2025
Close: Jul 17, 2025
Provide cellular telephone service and related equipment.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis