Learn more →The City of Covington is soliciting bids for a sanitary sewer rehabilitation project including pipe bursting of approximately 1,740 feet of 8-inch sewer and 760 feet of 12-inch sewer, open-cut replacement of 8-inch sewer, replacement of about 55 laterals, reconnection of 5 laterals, and open-cut replacement of 20 manholes. Additional tasks include CCTV pre-lining, CIPP lining, external point repairs, trenchless cleanouts, and manhole rehabilitation; the work is to be performed in Covington, Virginia. The contract requires substantial completion within 240 calendar days and final completion/payment readiness within 270 calendar days.
Posted Date
Dec 5, 2025
Due Date
Dec 16, 2025
Release: Dec 5, 2025
Close: Dec 16, 2025
The City of Covington is soliciting bids for a sanitary sewer rehabilitation project including pipe bursting of approximately 1,740 feet of 8-inch sewer and 760 feet of 12-inch sewer, open-cut replacement of 8-inch sewer, replacement of about 55 laterals, reconnection of 5 laterals, and open-cut replacement of 20 manholes. Additional tasks include CCTV pre-lining, CIPP lining, external point repairs, trenchless cleanouts, and manhole rehabilitation; the work is to be performed in Covington, Virginia. The contract requires substantial completion within 240 calendar days and final completion/payment readiness within 270 calendar days.
AvailableWork will need to provide a crane for onsite work. Drain primary clarifier #2 to approx 6-8 ft disconnect power; remove bridge with clarifier gearbox from location; reinstall clarifier gearbox with bridge reconnect power for test run operation field service labor; clarifier circular gearbox rebuild kit; quote on lower gearbox rebuild kit; upper sew euro-drive gearbox; disassemble bearings, gasket and lipseal disassemble, clean, wash all parts disassemble, wash bake stator; new bearings, lipseals and gaskets; assemble motor and test.
Posted Date
Nov 21, 2025
Due Date
Dec 5, 2025
Release: Nov 21, 2025
Close: Dec 5, 2025
Work will need to provide a crane for onsite work. Drain primary clarifier #2 to approx 6-8 ft disconnect power; remove bridge with clarifier gearbox from location; reinstall clarifier gearbox with bridge reconnect power for test run operation field service labor; clarifier circular gearbox rebuild kit; quote on lower gearbox rebuild kit; upper sew euro-drive gearbox; disassemble bearings, gasket and lipseal disassemble, clean, wash all parts disassemble, wash bake stator; new bearings, lipseals and gaskets; assemble motor and test.
Work will need to provide a crane for onsite work. Drain primary clarifier #2 to approx 6-8 ft disconnect power; remove bridge with clarifier gearbox from location; reinstall clarifier gearbox with bridge reconnect power for test run operation field service labor; clarifier circular gearbox rebuild kit; quote on lower gearbox rebuild kit; upper sew euro-drive gearbox; disassemble bearings, gasket and lipseal disassemble, clean, wash all parts disassemble, wash bake stator; new bearings, lipseals and gaskets; assemble motor and test.
Posted Date
Nov 21, 2025
Due Date
Dec 5, 2025
Release: Nov 21, 2025
Close: Dec 5, 2025
Work will need to provide a crane for onsite work. Drain primary clarifier #2 to approx 6-8 ft disconnect power; remove bridge with clarifier gearbox from location; reinstall clarifier gearbox with bridge reconnect power for test run operation field service labor; clarifier circular gearbox rebuild kit; quote on lower gearbox rebuild kit; upper sew euro-drive gearbox; disassemble bearings, gasket and lipseal disassemble, clean, wash all parts disassemble, wash bake stator; new bearings, lipseals and gaskets; assemble motor and test.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis