Discover Opportunities months before the RFP drops
Learn more →4 ea 2026 Nissan Leaf SV plus 75 kWh Battery - Vehicle.
Posted Date
Oct 22, 2025
Due Date
Dec 16, 2025
Release: Oct 22, 2025
Close: Dec 16, 2025
4 ea 2026 Nissan Leaf SV plus 75 kWh Battery - Vehicle.
AvailableShores median improvements includes 10 ea adjust ex. Utility to finished grade; 100 LF remove existing median curb (for pullout); 320 SF furnish and install concrete retaining wall (for pullout) ; 300 SF roadway pavement patch (at pullout).
Posted Date
Oct 22, 2025
Due Date
Dec 11, 2025
Release: Oct 22, 2025
Close: Dec 11, 2025
Shores median improvements includes 10 ea adjust ex. Utility to finished grade; 100 LF remove existing median curb (for pullout); 320 SF furnish and install concrete retaining wall (for pullout) ; 300 SF roadway pavement patch (at pullout).
The project's scope of work includes but is not limited to, the following: install LED street lights and construct missing sidewalk segments and implement accessible curb ramps.
Posted Date
Oct 30, 2025
Due Date
Nov 20, 2025
Release: Oct 30, 2025
Close: Nov 20, 2025
The project's scope of work includes but is not limited to, the following: install LED street lights and construct missing sidewalk segments and implement accessible curb ramps.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis