Discover Opportunities months before the RFP drops
Learn more →Work includes Traffic Control Plan Design & Installation, Right of Way Preparation,Irrigation Repair, Connect to Existing Water Line; 3951 LF of F&I 8" C-900 PVC Water Line By Open Cut; 10 LF of F&I 16" Steel Casing Pipe, F&I Fire Hydrant Assembly 10 ea, 35 SY of Remove & Replace 6" Concrete Driveway Pavement; 90 LF of Remove & Replace Curb and Gutter; 20 LF of Remove & Replace Sanitary Sewer with 8" Pressure Rated PVC Pipe. See attached file.
Posted Date
-
Due Date
Dec 30, 2025
Close: Dec 30, 2025
Work includes Traffic Control Plan Design & Installation, Right of Way Preparation,Irrigation Repair, Connect to Existing Water Line; 3951 LF of F&I 8" C-900 PVC Water Line By Open Cut; 10 LF of F&I 16" Steel Casing Pipe, F&I Fire Hydrant Assembly 10 ea, 35 SY of Remove & Replace 6" Concrete Driveway Pavement; 90 LF of Remove & Replace Curb and Gutter; 20 LF of Remove & Replace Sanitary Sewer with 8" Pressure Rated PVC Pipe. See attached file.
AvailableWork includes Traffic Control Plan Design & Installation, Right of Way Preparation,Irrigation Repair, Connect to Existing Water Line; 3951 LF of F&I 8" C-900 PVC Water Line By Open Cut; 10 LF of F&I 16" Steel Casing Pipe, F&I Fire Hydrant Assembly 10 ea, 35 SY of Remove & Replace 6" Concrete Driveway Pavement; 90 LF of Remove & Replace Curb and Gutter; 20 LF of Remove & Replace Sanitary Sewer with 8" Pressure Rated PVC Pipe. See attached file.
Posted Date
-
Due Date
Dec 30, 2025
Close: Dec 30, 2025
Work includes Traffic Control Plan Design & Installation, Right of Way Preparation,Irrigation Repair, Connect to Existing Water Line; 3951 LF of F&I 8" C-900 PVC Water Line By Open Cut; 10 LF of F&I 16" Steel Casing Pipe, F&I Fire Hydrant Assembly 10 ea, 35 SY of Remove & Replace 6" Concrete Driveway Pavement; 90 LF of Remove & Replace Curb and Gutter; 20 LF of Remove & Replace Sanitary Sewer with 8" Pressure Rated PVC Pipe. See attached file.
AvailableProject includes content management software (cms), conversion, installation, training, ongoing support, development, and inclusion of interior/department micro/sub-sites.
Posted Date
Oct 19, 2025
Due Date
Nov 18, 2025
Release: Oct 19, 2025
Close: Nov 18, 2025
Project includes content management software (cms), conversion, installation, training, ongoing support, development, and inclusion of interior/department micro/sub-sites.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis