Discover Opportunities months before the RFP drops
Learn more →Work includes approx. 2,463 LF of 1" Dia. HDPE DR 11 Pipe, Including All HDD, 533 LF of 1.5" Dia. HDPE DR 11 Pipe, Including All HDD, Excavation; 338 LF of 2" Dia. HDPE DR 11 Pipe, Including All HDD; 131 LF of 2.5" Dia. HDPE DR 11 Pipe; 28 LF of 4" Dia. HDPE DR 11 Pipe, Including All HDD. See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 8, 2026
Release: Dec 9, 2025
Close: Jan 8, 2026
Work includes approx. 2,463 LF of 1" Dia. HDPE DR 11 Pipe, Including All HDD, 533 LF of 1.5" Dia. HDPE DR 11 Pipe, Including All HDD, Excavation; 338 LF of 2" Dia. HDPE DR 11 Pipe, Including All HDD; 131 LF of 2.5" Dia. HDPE DR 11 Pipe; 28 LF of 4" Dia. HDPE DR 11 Pipe, Including All HDD. See outside link.
AvailableProvide 36 (1 ton cylinder) chlorine; 3 (1000 lb to 1250 lb cylinder) chlorine; 1 ton of activated carbon in bags - 35lbs. To 50 lbs. Bags 800 plus iodine; 7 tons of potassium permanganate (in either 110 lb. Or 300 lb. Drums); 12 drums of polyphosphate; 9,900 gallons of liquid ammonia sulfate 38% to 40% (ah 347); 11 drums of hydrofluosilicic acid 22% to 25% per 55 gallon drum as needed; 25 drums of sodium bisulfite 40% (600 lb drum); 4,500 gallons of liquid chlorine 12%; 4 drums of 40% sulfuric acid; 30 bags of calcium chloride 77-80% (50 lb. Bags); 3 bags of sodium bicarbonate (50 lb. Bags); 5 gallons of hydrochloric acid 20. See outside link.
Posted Date
Nov 5, 2025
Due Date
Dec 2, 2025
Release: Nov 5, 2025
Close: Dec 2, 2025
Provide 36 (1 ton cylinder) chlorine; 3 (1000 lb to 1250 lb cylinder) chlorine; 1 ton of activated carbon in bags - 35lbs. To 50 lbs. Bags 800 plus iodine; 7 tons of potassium permanganate (in either 110 lb. Or 300 lb. Drums); 12 drums of polyphosphate; 9,900 gallons of liquid ammonia sulfate 38% to 40% (ah 347); 11 drums of hydrofluosilicic acid 22% to 25% per 55 gallon drum as needed; 25 drums of sodium bisulfite 40% (600 lb drum); 4,500 gallons of liquid chlorine 12%; 4 drums of 40% sulfuric acid; 30 bags of calcium chloride 77-80% (50 lb. Bags); 3 bags of sodium bicarbonate (50 lb. Bags); 5 gallons of hydrochloric acid 20. See outside link.
Work includes construction of bleacher seating area and walkways around the tennis and pickle ball courts. Installation of shade structure will also be included. 20 sy remove existing structure; 80 cy common excavation; 440 sy aggregate base (ab3) (4" thick); 755 sy pccp (6" thick) (fiber reinforced); 440 sy concrete sidewalk (4" thick) (varies); 178 lf 8" stem wall (varying height); 36 sy 4" pccp cap of stem wall; 1 ea aluminum stair (4 step) / w railing; 1 ea pccp (2 step) / w railing; 8 sy ada ramp /w detectable warning; 2. 5 sy ada ramp / rail; 12 ea pier footing for shade structure; 1 ls installation of shade structure; 3 ls installation of electrical boxes; 552 sy landscaping. See outside link.
Posted Date
Oct 9, 2025
Due Date
Oct 30, 2025
Release: Oct 9, 2025
Close: Oct 30, 2025
Work includes construction of bleacher seating area and walkways around the tennis and pickle ball courts. Installation of shade structure will also be included. 20 sy remove existing structure; 80 cy common excavation; 440 sy aggregate base (ab3) (4" thick); 755 sy pccp (6" thick) (fiber reinforced); 440 sy concrete sidewalk (4" thick) (varies); 178 lf 8" stem wall (varying height); 36 sy 4" pccp cap of stem wall; 1 ea aluminum stair (4 step) / w railing; 1 ea pccp (2 step) / w railing; 8 sy ada ramp /w detectable warning; 2. 5 sy ada ramp / rail; 12 ea pier footing for shade structure; 1 ls installation of shade structure; 3 ls installation of electrical boxes; 552 sy landscaping. See outside link.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis