Discover Opportunities months before the RFP drops
Learn more →Work consists of pond maintenance project, includes 1,330 CY of excavation - channel and pond (lv); 1,975 CY of excavation - channel and pond (lv) (special 1); 800 TON of excavation - channel and pond (lv) (special 2); 253 SY of geotextile fabric type 5; 108 CY of random riprap class iii (fieldstone); 4,905 SY of rolled erosion prevention category 20; 296 CY of common topsoil borrow; 14 CY of granular filter; temporary rock construction entrance.
Posted Date
Nov 13, 2025
Due Date
Dec 2, 2025
Release: Nov 13, 2025
Close: Dec 2, 2025
Work consists of pond maintenance project, includes 1,330 CY of excavation - channel and pond (lv); 1,975 CY of excavation - channel and pond (lv) (special 1); 800 TON of excavation - channel and pond (lv) (special 2); 253 SY of geotextile fabric type 5; 108 CY of random riprap class iii (fieldstone); 4,905 SY of rolled erosion prevention category 20; 296 CY of common topsoil borrow; 14 CY of granular filter; temporary rock construction entrance.
Work consists of 17,700 - gal CRS-2p bituminous material; 65,700 SY - fa-2 modified 1/8" cl. "A" dresser trap rock; 13,500 lb - crack sealing material.
Posted Date
Jun 5, 2025
Due Date
Jul 8, 2025
Release: Jun 5, 2025
Close: Jul 8, 2025
Work consists of 17,700 - gal CRS-2p bituminous material; 65,700 SY - fa-2 modified 1/8" cl. "A" dresser trap rock; 13,500 lb - crack sealing material.
Private Minnesota Paid Family & Medical Leave Insurance.
Posted Date
May 1, 2025
Due Date
May 27, 2025
Release: May 1, 2025
Close: May 27, 2025
Private Minnesota Paid Family & Medical Leave Insurance.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis