Discover Opportunities months before the RFP drops
Learn more →This project is an upgrade to a segment of the existing north bay aqueduct pipeline that parallels the Silverado trail and crosses the Conn creek floodway to provide water. The existing 12" pipeline under the streambed has been exposed to heavy scour and erosion and a concrete cap was placed over the pipeline during an emergency repair. The main purpose of the project is to remove the concrete cap and existing pipeline from the creek.
Posted Date
Nov 17, 2025
Due Date
Jan 7, 2026
Release: Nov 17, 2025
Close: Jan 7, 2026
This project is an upgrade to a segment of the existing north bay aqueduct pipeline that parallels the Silverado trail and crosses the Conn creek floodway to provide water. The existing 12" pipeline under the streambed has been exposed to heavy scour and erosion and a concrete cap was placed over the pipeline during an emergency repair. The main purpose of the project is to remove the concrete cap and existing pipeline from the creek.
AvailableConsists of removal and disposal of existing roofing material, dry rot repair and roofing
Posted Date
-
Due Date
Oct 6, 2025
Release: -
Close: Oct 6, 2025
Consists of removal and disposal of existing roofing material, dry rot repair and roofing
Provide landscape maintenance services for a 71-acre property includes mowing all grass areas, blowing hardscapes, general tree and shrubs maintenance, irrigation and drainage maintenance and hazardous tree removal.
Posted Date
Jun 26, 2024
Due Date
Aug 22, 2024
Release: Jun 26, 2024
Close: Aug 22, 2024
Provide landscape maintenance services for a 71-acre property includes mowing all grass areas, blowing hardscapes, general tree and shrubs maintenance, irrigation and drainage maintenance and hazardous tree removal.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis