Discover Opportunities months before the RFP drops
Learn more →The Work includes the removal of the failed wingwall and other debris from the culvert apron and reconstruction of new sheet pile wingwall.
Posted Date
Nov 12, 2025
Due Date
Dec 3, 2025
Release: Nov 12, 2025
Close: Dec 3, 2025
The Work includes the removal of the failed wingwall and other debris from the culvert apron and reconstruction of new sheet pile wingwall.
The project includes the following work: sanitary, storm, and paving improvements for the bellevue entertainment district. Work includes, 1,660 LF of construct aggregate bedding for type f3, 8" pvc sanitary sewer pipe; 125 LF of construct aggregate bedding for type f3, 6" pvc sanitary sewer pipe; 270 LF of construct aggregate bedding for type f3, 6" vcp sanitary sewer pipe; 270 LF of construct 8" vcp sanitary sewer pipe; 1,660 LF of construct 8" pvc sanitary sewer pipe; 1,995 LF of perform cctv pipeline inspection; 170 CY of construct aggregate bedding for trench stabilization; 515 LF of construct aggregate bedding for type r2, 18" storm sewer pipe; 50 TON of construct type b rip-rap; 2,945 LF of clean storm sewer pipe; 999 SY of remove pavement. See outside link.
Posted Date
Oct 9, 2025
Due Date
Oct 30, 2025
Release: Oct 9, 2025
Close: Oct 30, 2025
The project includes the following work: sanitary, storm, and paving improvements for the bellevue entertainment district. Work includes, 1,660 LF of construct aggregate bedding for type f3, 8" pvc sanitary sewer pipe; 125 LF of construct aggregate bedding for type f3, 6" pvc sanitary sewer pipe; 270 LF of construct aggregate bedding for type f3, 6" vcp sanitary sewer pipe; 270 LF of construct 8" vcp sanitary sewer pipe; 1,660 LF of construct 8" pvc sanitary sewer pipe; 1,995 LF of perform cctv pipeline inspection; 170 CY of construct aggregate bedding for trench stabilization; 515 LF of construct aggregate bedding for type r2, 18" storm sewer pipe; 50 TON of construct type b rip-rap; 2,945 LF of clean storm sewer pipe; 999 SY of remove pavement. See outside link.
The demolition of the existing swimming pool facility, final grading and seeding of disturbed areas.
Posted Date
May 22, 2025
Due Date
Jun 4, 2025
Release: May 22, 2025
Close: Jun 4, 2025
The demolition of the existing swimming pool facility, final grading and seeding of disturbed areas.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis