Discover Opportunities months before the RFP drops
Learn more →Partial depth reconstruction, spot replacement of concrete panels, and full depth reclamation and rehabilitation. The construction/reconstruction of driveways, sidewalks and curb and gutter along with the addition of signing and striping is also included in the work.
Posted Date
Jun 23, 2025
Due Date
Jul 23, 2025
Release: Jun 23, 2025
Close: Jul 23, 2025
Partial depth reconstruction, spot replacement of concrete panels, and full depth reclamation and rehabilitation. The construction/reconstruction of driveways, sidewalks and curb and gutter along with the addition of signing and striping is also included in the work.
Landscape improvements. The work consists of protecting and transplanting existing trees and installation of new landscape material which consists of trees, shrubs, and seeding. The project also includes installation of permanent landscape irrigation. The existing irrigation controller and meter are to be utilized for the new permanent irrigation. The existing riprap is to be salvaged and reinstalled per plans, any additional riprap is to be hauled and coordinated with TxDOT and the City for location within 2.5 miles from the project site. The work under this contract includes furnishing all labor, tools, material, and equipment, for construction of: landscaping and drainage improvements.
Posted Date
May 13, 2025
Due Date
Jun 3, 2025
Release: May 13, 2025
Close: Jun 3, 2025
Landscape improvements. The work consists of protecting and transplanting existing trees and installation of new landscape material which consists of trees, shrubs, and seeding. The project also includes installation of permanent landscape irrigation. The existing irrigation controller and meter are to be utilized for the new permanent irrigation. The existing riprap is to be salvaged and reinstalled per plans, any additional riprap is to be hauled and coordinated with TxDOT and the City for location within 2.5 miles from the project site. The work under this contract includes furnishing all labor, tools, material, and equipment, for construction of: landscaping and drainage improvements.
The work generally includes construction of concrete pavement right-turn lanes, concrete curb and gutter, pavement markings and delineators, sidewalk, pedestrian ramps, and signal modifications. Work also includes traffic control, erosion control, and any other work.
Posted Date
Feb 12, 2025
Due Date
Mar 25, 2025
Release: Feb 12, 2025
Close: Mar 25, 2025
The work generally includes construction of concrete pavement right-turn lanes, concrete curb and gutter, pavement markings and delineators, sidewalk, pedestrian ramps, and signal modifications. Work also includes traffic control, erosion control, and any other work.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis