Learn more →Work includes 1 LS electrical upgrades; 6 EA mechanical sludge collector; 6 EA mechanical sludge collector installation.
Posted Date
Nov 5, 2025
Due Date
Dec 10, 2025
Release: Nov 5, 2025
Close: Dec 10, 2025
Work includes 1 LS electrical upgrades; 6 EA mechanical sludge collector; 6 EA mechanical sludge collector installation.
Three new vehicles, one each of; (1) new 1/2 ton, 4x4, extended cab, swb pickup, and (2) new 1 ton, 4x4, crew cab, diesel engine pickup with lwb and gooseneck utility body, and (3) new 1 ton, 4x4, crew cab, diesel engine pickup with lwb and gooseneck utility body with crane.
Posted Date
Sep 26, 2025
Due Date
Oct 3, 2025
Release: Sep 26, 2025
Close: Oct 3, 2025
Three new vehicles, one each of; (1) new 1/2 ton, 4x4, extended cab, swb pickup, and (2) new 1 ton, 4x4, crew cab, diesel engine pickup with lwb and gooseneck utility body, and (3) new 1 ton, 4x4, crew cab, diesel engine pickup with lwb and gooseneck utility body with crane.
Work includes 16,252 SY single layer crs-2p with stone chip seal coat-sherard, 6,108 SY slurry seal coat - sherard, 2000 SY asphalt patching - sherard, traffic control. Alternate: 990 LF alkyd paint pavement marking, 16,252 SY chip seal overshoot, 990 LF epoxy pavement marking.
Posted Date
Sep 3, 2025
Due Date
Oct 3, 2025
Release: Sep 3, 2025
Close: Oct 3, 2025
Work includes 16,252 SY single layer crs-2p with stone chip seal coat-sherard, 6,108 SY slurry seal coat - sherard, 2000 SY asphalt patching - sherard, traffic control. Alternate: 990 LF alkyd paint pavement marking, 16,252 SY chip seal overshoot, 990 LF epoxy pavement marking.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis