Discover Opportunities months before the RFP drops
Learn more →Pumping station reliability improvements: Contract 26-001 – General Construction, Contract 26-002 – Electrical Construction, Contract 26-003 – HVAC Construction. The Project generally comprises modifications to the existing Pump Station which pumps 30 MGD of raw water from the Susquehanna River to the Octoraro Water Treatment Plant. Modifications include but are not limited to, replacement of three existing pumps and installation of two new generators. The existing dry chemical system will also be replaced with a liquid chemical system. Electrical work includes the replacement in kind of the existing transformer as well as the installation of a new switchgear building to hold new switchgear equipment and VFDs for the new pumps. Work also includes the demolition of an existing building and the addition of a small building adjacent to the existing pump station for storage and handling of the liquid chemical system.
Posted Date
Nov 19, 2025
Due Date
Jan 14, 2026
Release: Nov 19, 2025
Close: Jan 14, 2026
Pumping station reliability improvements: Contract 26-001 – General Construction, Contract 26-002 – Electrical Construction, Contract 26-003 – HVAC Construction. The Project generally comprises modifications to the existing Pump Station which pumps 30 MGD of raw water from the Susquehanna River to the Octoraro Water Treatment Plant. Modifications include but are not limited to, replacement of three existing pumps and installation of two new generators. The existing dry chemical system will also be replaced with a liquid chemical system. Electrical work includes the replacement in kind of the existing transformer as well as the installation of a new switchgear building to hold new switchgear equipment and VFDs for the new pumps. Work also includes the demolition of an existing building and the addition of a small building adjacent to the existing pump station for storage and handling of the liquid chemical system.
AvailableFurnishing, delivery, and laundering of uniforms.
Posted Date
Oct 28, 2025
Due Date
Nov 25, 2025
Release: Oct 28, 2025
Close: Nov 25, 2025
Furnishing, delivery, and laundering of uniforms.
Arv replacements on arterial transmission mains. Including 7 ea Simple Air Release Valves with 5'x5' Chamber in Public ROW, Complete in place; 1 ea M2-46 Air Release Valve with 5'x5' Chamber in CWA Easement, Complete in place; 2 ea Full Repair, Simple Air Release Valves, Complete in place.
Posted Date
Oct 21, 2025
Due Date
Nov 18, 2025
Release: Oct 21, 2025
Close: Nov 18, 2025
Arv replacements on arterial transmission mains. Including 7 ea Simple Air Release Valves with 5'x5' Chamber in Public ROW, Complete in place; 1 ea M2-46 Air Release Valve with 5'x5' Chamber in CWA Easement, Complete in place; 2 ea Full Repair, Simple Air Release Valves, Complete in place.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis