Discover Opportunities months before the RFP drops
Learn more →Chester Sewer District (Chester County, SC) is soliciting proposals for vegetation maintenance and right-of-way cutting services. A mandatory pre-bid meeting is scheduled for January 13, 2026 at 9:00 AM at 2715 Gaston Farm Road; proposals are due February 4, 2026 by 5:00 PM. The solicitation (ID 11-2025) was posted to the South Carolina Business Opportunities site and links to the district’s website for full details and proposal download.
Posted Date
Nov 24, 2025
Due Date
Feb 4, 2026
Release: Nov 24, 2025
Close: Feb 4, 2026
Chester Sewer District (Chester County, SC) is soliciting proposals for vegetation maintenance and right-of-way cutting services. A mandatory pre-bid meeting is scheduled for January 13, 2026 at 9:00 AM at 2715 Gaston Farm Road; proposals are due February 4, 2026 by 5:00 PM. The solicitation (ID 11-2025) was posted to the South Carolina Business Opportunities site and links to the district’s website for full details and proposal download.
AvailableWork includes milling and proper disposal of the existing driveway asphalt surface, installation of new base and surface asphalt (approx 445 LF by 20' wide), installation of a 6" soil cement base, installation of a 3" hot mix asphalt type c surface course, erosion and sedimentation control measures, installation of 4" PVC conduit under driveway, cleaning of ditch entrance and exit at the existing culvert pipe, implementation of ingress and egress traffic control and safety measures.
Posted Date
Oct 16, 2025
Due Date
Nov 6, 2025
Release: Oct 16, 2025
Close: Nov 6, 2025
Work includes milling and proper disposal of the existing driveway asphalt surface, installation of new base and surface asphalt (approx 445 LF by 20' wide), installation of a 6" soil cement base, installation of a 3" hot mix asphalt type c surface course, erosion and sedimentation control measures, installation of 4" PVC conduit under driveway, cleaning of ditch entrance and exit at the existing culvert pipe, implementation of ingress and egress traffic control and safety measures.
Project consists of new wastewater pump station, electrical building, generator, bar screen, generator completing all site work and associated appurtenances. See outside link.
Posted Date
Feb 6, 2025
Due Date
Mar 7, 2025
Release: Feb 6, 2025
Close: Mar 7, 2025
Project consists of new wastewater pump station, electrical building, generator, bar screen, generator completing all site work and associated appurtenances. See outside link.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis