Discover Opportunities months before the RFP drops
Learn more →The Town of Charlestown, Rhode Island, seeks proposals for the installation of a labyrinth in Pawaget Park. The project involves installing a 39'-7.75" diameter Breamore paver labyrinth kit, with additional landscaping and site preparation. Contractors must be licensed in Rhode Island and comply with prevailing wage requirements. The project aims to enhance the park's meditative and reflective area.
Posted Date
-
Due Date
Oct 11, 2024
Release: -
Close: Oct 11, 2024
The Town of Charlestown, Rhode Island, seeks proposals for the installation of a labyrinth in Pawaget Park. The project involves installing a 39'-7.75" diameter Breamore paver labyrinth kit, with additional landscaping and site preparation. Contractors must be licensed in Rhode Island and comply with prevailing wage requirements. The project aims to enhance the park's meditative and reflective area.
The Town of Charlestown is soliciting bids for a new 2024/25 model diesel truck with a dump body, sander controls, snow plow, and frame. The truck must meet specific technical specifications and be ready for immediate service as a heavy-duty dump truck/snow removal vehicle. Bidders must provide detailed specifications and may include a trade-in option for a 2016 International 7400 truck.
Posted Date
-
Due Date
Oct 15, 2024
Release: -
Close: Oct 15, 2024
The Town of Charlestown is soliciting bids for a new 2024/25 model diesel truck with a dump body, sander controls, snow plow, and frame. The truck must meet specific technical specifications and be ready for immediate service as a heavy-duty dump truck/snow removal vehicle. Bidders must provide detailed specifications and may include a trade-in option for a 2016 International 7400 truck.
Demolition of old fire station. This detailed scope of work outlines the demolition process, including pre-demolition preparations, structural removal, foundation demolition, site cleanup, safety measures, and final restoration.
Posted Date
May 5, 2025
Due Date
May 30, 2025
Release: May 5, 2025
Close: May 30, 2025
Demolition of old fire station. This detailed scope of work outlines the demolition process, including pre-demolition preparations, structural removal, foundation demolition, site cleanup, safety measures, and final restoration.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis