Discover Opportunities months before the RFP drops
Learn more →Work consists of removing and replacing four pumps in the ftw/www building and associated mechanical work. Existing motor control centers (mccs) and variable frequency drives (vfds) will be removed and salvaged. Six new vfds will be installed. New power panels and associated electrical work is included. In addition, the work includes the installation of 50+ cathodic protection test stations. There is approx 660 LF of internal joint bonding that is required in 36" diameter pipe. Approx., 300 LF of external joint bonding on 8" or 12" buried pipe is also required. Other work includes external joint bonding inside of structures, installation of dc blockers, installation of dielectric unions, installation of insulating flange kits, and installation of buried galvanic anodes.
Posted Date
Nov 19, 2025
Due Date
Jan 20, 2026
Release: Nov 19, 2025
Close: Jan 20, 2026
Work consists of removing and replacing four pumps in the ftw/www building and associated mechanical work. Existing motor control centers (mccs) and variable frequency drives (vfds) will be removed and salvaged. Six new vfds will be installed. New power panels and associated electrical work is included. In addition, the work includes the installation of 50+ cathodic protection test stations. There is approx 660 LF of internal joint bonding that is required in 36" diameter pipe. Approx., 300 LF of external joint bonding on 8" or 12" buried pipe is also required. Other work includes external joint bonding inside of structures, installation of dc blockers, installation of dielectric unions, installation of insulating flange kits, and installation of buried galvanic anodes.
AvailableWork includes clearing (tree removal) & grubbing the wooded 2 acre settlement basin site, excavation and mass grading of settlement basin pad (7,500 CY net import); road work 1,000 LF of new 12-16 foot wide gravel roads and reconstruction of 2,100 LF of asphalt road through timpanogos park), construction of a cast-in-place connection and drain vault, a 510' x 120' x 6' settlement and dewatering basin, and miscellaneous concrete pads/retaining walls; installation of approximately 700 feet of 24-inch diameter hdpe sluicing pipe down a steep grade (11-64% grade); installation of 80 feet of 4-inch diameter hdpe pump suction pipe.
Posted Date
Oct 30, 2025
Due Date
Dec 18, 2025
Release: Oct 30, 2025
Close: Dec 18, 2025
Work includes clearing (tree removal) & grubbing the wooded 2 acre settlement basin site, excavation and mass grading of settlement basin pad (7,500 CY net import); road work 1,000 LF of new 12-16 foot wide gravel roads and reconstruction of 2,100 LF of asphalt road through timpanogos park), construction of a cast-in-place connection and drain vault, a 510' x 120' x 6' settlement and dewatering basin, and miscellaneous concrete pads/retaining walls; installation of approximately 700 feet of 24-inch diameter hdpe sluicing pipe down a steep grade (11-64% grade); installation of 80 feet of 4-inch diameter hdpe pump suction pipe.
AvailableConstruction of a cast-in-place connection and drain vault, a 510' x 120' x 6' settlement and dewatering basin, and miscellaneous concrete pads/retaining walls; installation of approximately 700 feet of 24-inch diameter hdpe sluicing pipe down a steep grade (11-64% grade); installation of 80 feet of 4-inch diameter hdpe pump suction pipe; installation of 4,400 LF of 6-foot chain-link security fencing; and mechanical work including weir gates, plug and butterfly valves, combination air valves; electrical work including rtu/control panel, multiple fo patch panels, fo and power conduits including conductors.
Posted Date
Oct 30, 2025
Due Date
Dec 18, 2025
Release: Oct 30, 2025
Close: Dec 18, 2025
Construction of a cast-in-place connection and drain vault, a 510' x 120' x 6' settlement and dewatering basin, and miscellaneous concrete pads/retaining walls; installation of approximately 700 feet of 24-inch diameter hdpe sluicing pipe down a steep grade (11-64% grade); installation of 80 feet of 4-inch diameter hdpe pump suction pipe; installation of 4,400 LF of 6-foot chain-link security fencing; and mechanical work including weir gates, plug and butterfly valves, combination air valves; electrical work including rtu/control panel, multiple fo patch panels, fo and power conduits including conductors.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis