Learn more →Work includes to replace the existing sewer lift station well, controls, and pumps that is located inside of the mcgee building mechanical room and place the new lift station outside of the mechanical room.
Posted Date
Nov 26, 2025
Due Date
Jan 6, 2026
Release: Nov 26, 2025
Close: Jan 6, 2026
Work includes to replace the existing sewer lift station well, controls, and pumps that is located inside of the mcgee building mechanical room and place the new lift station outside of the mechanical room.
AvailableThis project consists of the renovation of an approx. 7,740 SF area within the Building. The building program consists of lobby, reception, offices, storage space, student testing rooms, and flexible work areas. The building is structurally comprised of structural steel columns and framing with grade beams. The building is non-separated single use. The renovation will include alteration of the existing HVAC system, new LED lighting throughout, and renovation of mens and womens restroom as an alternate. Coordination of slab work and plumbing work with the grade beams is critical. The existing stairwell is remediated and painted as part of an alternate. Exterior concrete pads are another alternate. The exterior of the building consists of existing face brick, storefront glazing system, and an alternate to add metal panels at the new lobby entrance.
Posted Date
-
Due Date
Nov 20, 2025
Release: -
Close: Nov 20, 2025
This project consists of the renovation of an approx. 7,740 SF area within the Building. The building program consists of lobby, reception, offices, storage space, student testing rooms, and flexible work areas. The building is structurally comprised of structural steel columns and framing with grade beams. The building is non-separated single use. The renovation will include alteration of the existing HVAC system, new LED lighting throughout, and renovation of mens and womens restroom as an alternate. Coordination of slab work and plumbing work with the grade beams is critical. The existing stairwell is remediated and painted as part of an alternate. Exterior concrete pads are another alternate. The exterior of the building consists of existing face brick, storefront glazing system, and an alternate to add metal panels at the new lobby entrance.
Seeking commissioning services for a new building construction of approx. 25,000 SF. To include review of components, equipment submittals, and plans provided by the architect and contractor. All testing, balancing, start-up, and adjustments must be made per state statutes of public buildings required by the state. Review O&M manuals, project as-builts, and all other documentation as necessary. Commissioning reports will be made to the owner before the project closeout.
Posted Date
Jul 2, 2025
Due Date
Aug 1, 2025
Release: Jul 2, 2025
Close: Aug 1, 2025
Seeking commissioning services for a new building construction of approx. 25,000 SF. To include review of components, equipment submittals, and plans provided by the architect and contractor. All testing, balancing, start-up, and adjustments must be made per state statutes of public buildings required by the state. Review O&M manuals, project as-builts, and all other documentation as necessary. Commissioning reports will be made to the owner before the project closeout.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis