Discover Opportunities months before the RFP drops
Learn more →Renovations to include but are not limited to: Removal of existing carpeting and wall base as indicated on the proposal drawings. Preparing existing slab for installation of new luxury vinyl plank. Wall demolition, cutting concrete and removing concrete and trenching for installation of new waste and supply piping from existing sink, directly adjacent to the relocated equipment location.
Posted Date
Dec 1, 2025
Due Date
Jan 8, 2026
Release: Dec 1, 2025
Close: Jan 8, 2026
Renovations to include but are not limited to: Removal of existing carpeting and wall base as indicated on the proposal drawings. Preparing existing slab for installation of new luxury vinyl plank. Wall demolition, cutting concrete and removing concrete and trenching for installation of new waste and supply piping from existing sink, directly adjacent to the relocated equipment location.
AvailableWork includes gabc, hma surfacing, rcp, catch basins, and miscellaneous related items on pine land trail.
Posted Date
Oct 30, 2025
Due Date
Dec 4, 2025
Release: Oct 30, 2025
Close: Dec 4, 2025
Work includes gabc, hma surfacing, rcp, catch basins, and miscellaneous related items on pine land trail.
Remove and replace the existing windows at the John Ford Community Center. Removal of old windows, installation of new windows, and proper sealing to endure durability, safety, and compliance with all building codes.
Posted Date
Aug 18, 2025
Due Date
Sep 19, 2025
Release: Aug 18, 2025
Close: Sep 19, 2025
Remove and replace the existing windows at the John Ford Community Center. Removal of old windows, installation of new windows, and proper sealing to endure durability, safety, and compliance with all building codes.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis