Discover Opportunities months before the RFP drops
Learn more →The work herein shall include all materials and labor necessary to install designated carpet, LVT, Sheet Vinyl, reducer, and rubber cove base. When necessary, the removal of all existing floor covering, existing adhesives, shall be included in this work.
Posted Date
Dec 11, 2025
Due Date
Jan 14, 2026
Release: Dec 11, 2025
Close: Jan 14, 2026
The work herein shall include all materials and labor necessary to install designated carpet, LVT, Sheet Vinyl, reducer, and rubber cove base. When necessary, the removal of all existing floor covering, existing adhesives, shall be included in this work.
AvailableWork consists of school removal and replacement of all hvac equipment. Removal and replacement of all condensation piping including but not limited to flexible seismic connection to drain pan, p-trap with vent and pipe supports for extension to drains. Removal and replacement of the complete roofing system on buildings.
Posted Date
Nov 6, 2025
Due Date
Dec 11, 2025
Release: Nov 6, 2025
Close: Dec 11, 2025
Work consists of school removal and replacement of all hvac equipment. Removal and replacement of all condensation piping including but not limited to flexible seismic connection to drain pan, p-trap with vent and pipe supports for extension to drains. Removal and replacement of the complete roofing system on buildings.
Work consists of professional theatrical lighting (TL) upgrades of the Greenfield middle school theatre, Flying hills multipurpose room and Los Coches creek middle school theatrical lighting systems. Remove the three existing dimmer panels; replace the two 3p 120/208 60a feeders from the main power distribution panel with a single 3p 120/208 100a feeder with appropriate wire gauge; provide and install new conduit, appropriately sized conductors and other power distribution materials to lighting positions over the stage (18 circuits) and at the front light pipe location (6 circuits); remove existing front light location materials below the ceiling and abandon other materials above the ceiling; provide and install 1. 5 schedule 40 pipe suspended with threaded rod from structure above the ceiling.
Posted Date
Nov 6, 2025
Due Date
Dec 8, 2025
Release: Nov 6, 2025
Close: Dec 8, 2025
Work consists of professional theatrical lighting (TL) upgrades of the Greenfield middle school theatre, Flying hills multipurpose room and Los Coches creek middle school theatrical lighting systems. Remove the three existing dimmer panels; replace the two 3p 120/208 60a feeders from the main power distribution panel with a single 3p 120/208 100a feeder with appropriate wire gauge; provide and install new conduit, appropriately sized conductors and other power distribution materials to lighting positions over the stage (18 circuits) and at the front light pipe location (6 circuits); remove existing front light location materials below the ceiling and abandon other materials above the ceiling; provide and install 1. 5 schedule 40 pipe suspended with threaded rod from structure above the ceiling.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis