Learn more →Remove existing bridge deck and guardrail and to install 2 108" OD smooth wall culverts, each being at least 46 ft in length.
Posted Date
Sep 1, 2025
Due Date
Sep 15, 2025
Release: Sep 1, 2025
Close: Sep 15, 2025
Remove existing bridge deck and guardrail and to install 2 108" OD smooth wall culverts, each being at least 46 ft in length.
The project involves replacing a three span (3 @ 16'-0") RC channel beam and replacing it with a single span (1@ 54'-6") PPC deck beam bridge. The project includes in-stream work, ditch work, and approach roadway work.
Posted Date
Apr 3, 2025
Due Date
Apr 25, 2025
Release: Apr 3, 2025
Close: Apr 25, 2025
The project involves replacing a three span (3 @ 16'-0") RC channel beam and replacing it with a single span (1@ 54'-6") PPC deck beam bridge. The project includes in-stream work, ditch work, and approach roadway work.
The project involves replacing a three span (3 @ 15'-6") RC channel beam and replacing it with a single span (1@ 64'-7") PPC deck beam bridge. The project includes in-stream work, ditch work, and approach roadway work.
Posted Date
Apr 3, 2025
Due Date
Apr 25, 2025
Release: Apr 3, 2025
Close: Apr 25, 2025
The project involves replacing a three span (3 @ 15'-6") RC channel beam and replacing it with a single span (1@ 64'-7") PPC deck beam bridge. The project includes in-stream work, ditch work, and approach roadway work.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis