Discover Opportunities months before the RFP drops
Learn more →Construction of an approx. 3,500 SF pre-engineered metal social hall including site preparation of building pad; excavation for foundations; concrete foundations; construction of interior walls and wall finishes for various rooms; painting; blocking for MEP trades; stone subbase; reinforced concrete floor; foundation drains; installation of toilet room accessories; interior and exterior signage; floor finishes; suspended acoustical ceiling system; fire extinguishers; insulation; sheathing; underlayment and metal standing seam roof panels; new doors, door hardware and windows; gutters and downspouts; fascia and vented soffit; stone backfill for trenches; restoration of disturbed areas; and all other items and necessary appurtenances. There is an add alternate for epoxy floor coating. Contractor is responsible for extending foundation drains 5' outside of the building. Site contractor to then extend drains to storm sewer system. Plumbing contractor will connect to downspouts and extend roof drain collector within 5' outside of building.
Posted Date
Dec 12, 2025
Due Date
Jan 7, 2026
Release: Dec 12, 2025
Close: Jan 7, 2026
Construction of an approx. 3,500 SF pre-engineered metal social hall including site preparation of building pad; excavation for foundations; concrete foundations; construction of interior walls and wall finishes for various rooms; painting; blocking for MEP trades; stone subbase; reinforced concrete floor; foundation drains; installation of toilet room accessories; interior and exterior signage; floor finishes; suspended acoustical ceiling system; fire extinguishers; insulation; sheathing; underlayment and metal standing seam roof panels; new doors, door hardware and windows; gutters and downspouts; fascia and vented soffit; stone backfill for trenches; restoration of disturbed areas; and all other items and necessary appurtenances. There is an add alternate for epoxy floor coating. Contractor is responsible for extending foundation drains 5' outside of the building. Site contractor to then extend drains to storm sewer system. Plumbing contractor will connect to downspouts and extend roof drain collector within 5' outside of building.
AvailableElectrical: the scope of work generally includes supply of electrical service including distribution panels and all necessary wiring and conduit; LED lighting; occupancy sensors; receptacles; data ports and conduit; emergency lighting; fire alarm system; service entrance conductors and conduit from ct cabinet to utility transformers per utility company requirements; emergency generator and generator transfer switch; generator annunciation panel; connections to mechanical equipment; site lighting, wiring and conduit; and all necessary appurtenances.
Posted Date
Dec 12, 2025
Due Date
Jan 7, 2026
Release: Dec 12, 2025
Close: Jan 7, 2026
Electrical: the scope of work generally includes supply of electrical service including distribution panels and all necessary wiring and conduit; LED lighting; occupancy sensors; receptacles; data ports and conduit; emergency lighting; fire alarm system; service entrance conductors and conduit from ct cabinet to utility transformers per utility company requirements; emergency generator and generator transfer switch; generator annunciation panel; connections to mechanical equipment; site lighting, wiring and conduit; and all necessary appurtenances.
AvailableConstruction of a fire protection system for the new social hall including fire service entrance, sprinkler heads and all other associated piping and necessary appurtenances.
Posted Date
Dec 12, 2025
Due Date
Jan 7, 2026
Release: Dec 12, 2025
Close: Jan 7, 2026
Construction of a fire protection system for the new social hall including fire service entrance, sprinkler heads and all other associated piping and necessary appurtenances.
AvailableMore RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis