Discover Opportunities months before the RFP drops
Learn more →Construction of the water, sanitary sewer and drainage facilities and paving and appurtenances.
Posted Date
Nov 27, 2025
Due Date
Dec 16, 2025
Release: Nov 27, 2025
Close: Dec 16, 2025
Construction of the water, sanitary sewer and drainage facilities and paving and appurtenances.
AvailableProvide detention and mass grading. Scope of project: approx. 700,000 CY of excavation with on-site disposal (including light clearing and grubbing, demucking, site preparation, hauling excavation, compaction of material, and clay liner installation); approx. 658 LF of 24" through 60" reinforced concrete pipe; 3,869 LF of 3' x 3' through 12' x 6' reinforced concrete boxes (RCB); and all appurtenances; approx. 117,900 LF of proposed swale for positive drainage.
Posted Date
Oct 30, 2025
Due Date
Nov 19, 2025
Release: Oct 30, 2025
Close: Nov 19, 2025
Provide detention and mass grading. Scope of project: approx. 700,000 CY of excavation with on-site disposal (including light clearing and grubbing, demucking, site preparation, hauling excavation, compaction of material, and clay liner installation); approx. 658 LF of 24" through 60" reinforced concrete pipe; 3,869 LF of 3' x 3' through 12' x 6' reinforced concrete boxes (RCB); and all appurtenances; approx. 117,900 LF of proposed swale for positive drainage.
The rehabilitation of irrigation pump station (IPS) no. 1, 2, and 4 including but not limited to abrasive blasting and recoating all above ground piping, valves, and fittings, at IPS no. 1, 2, and 4, furnish and install (5) five 6-inch hydrocyclone sand filters by netafim including all piping modifications as shown on the plans at IPS no. 4, and electrical system upgrades.
Posted Date
Oct 30, 2025
Due Date
Nov 20, 2025
Release: Oct 30, 2025
Close: Nov 20, 2025
The rehabilitation of irrigation pump station (IPS) no. 1, 2, and 4 including but not limited to abrasive blasting and recoating all above ground piping, valves, and fittings, at IPS no. 1, 2, and 4, furnish and install (5) five 6-inch hydrocyclone sand filters by netafim including all piping modifications as shown on the plans at IPS no. 4, and electrical system upgrades.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis