Discover Opportunities months before the RFP drops
Learn more →Work includes mobilization, selective site demolition, erosion and sediment controls, flow diversion, and removal of accumulated sediment to create a functional floodplain area with a baseflow channel that ties to the existing channel at the upstream extents and at the pedestrian bridge crossing at the Ninth Street Park property. Log sill and woody debris grade control structures will be installed to provide grade control across the restored system. The restored area will be planted as specified in the Drawings to provide native riparian buffer habitat.
Posted Date
Dec 3, 2025
Due Date
Jan 14, 2026
Release: Dec 3, 2025
Close: Jan 14, 2026
Work includes mobilization, selective site demolition, erosion and sediment controls, flow diversion, and removal of accumulated sediment to create a functional floodplain area with a baseflow channel that ties to the existing channel at the upstream extents and at the pedestrian bridge crossing at the Ninth Street Park property. Log sill and woody debris grade control structures will be installed to provide grade control across the restored system. The restored area will be planted as specified in the Drawings to provide native riparian buffer habitat.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis