Discover Opportunities months before the RFP drops
Learn more →Work includes 1875 LF of stream restoration including excavation, grading, slope stabilization fabric, erosion and sedimentation controls, landscape restoration, vegetated coir log, riparian buffer plants, replacement of existing retaining wall, and all necessary appurtenances and restoration for said construction.
Posted Date
Dec 11, 2025
Due Date
Jan 22, 2026
Release: Dec 11, 2025
Close: Jan 22, 2026
Work includes 1875 LF of stream restoration including excavation, grading, slope stabilization fabric, erosion and sedimentation controls, landscape restoration, vegetated coir log, riparian buffer plants, replacement of existing retaining wall, and all necessary appurtenances and restoration for said construction.
AvailableProvide removal and replacement of approx 5,500 SF of concrete sidewalk and 1,200 LF of concrete curb, bituminous roadway restoration, ADA ramp replacement, and all necessary appurtenances and restoration for said construction. Work includes curb cut ramps - ADA compliant, including demolition, excavation, 4" AASHTO no.57 aggregate, concrete curb, cheekwalls, sidewalk and detectable warning surface as per detail, including restoration; removal and replacement of concrete driveway (6" depth), reinforced including demolition, excavation, 4" aashto no. 57 aggregate subbase; removal and replacement of concrete sidewalk (4" depth), reinforced including demolition, excavation, 4" AASHTO no.57 aggregate subbase. See attached file.
Posted Date
Jun 5, 2025
Due Date
Jun 25, 2025
Release: Jun 5, 2025
Close: Jun 25, 2025
Provide removal and replacement of approx 5,500 SF of concrete sidewalk and 1,200 LF of concrete curb, bituminous roadway restoration, ADA ramp replacement, and all necessary appurtenances and restoration for said construction. Work includes curb cut ramps - ADA compliant, including demolition, excavation, 4" AASHTO no.57 aggregate, concrete curb, cheekwalls, sidewalk and detectable warning surface as per detail, including restoration; removal and replacement of concrete driveway (6" depth), reinforced including demolition, excavation, 4" aashto no. 57 aggregate subbase; removal and replacement of concrete sidewalk (4" depth), reinforced including demolition, excavation, 4" AASHTO no.57 aggregate subbase. See attached file.
Contract includes approx. 12,200 SY of roadway milling and profiling, 2 1/2" Superpave WMA binder course, 1 1/2" Superpave WMA wearing course, base repair, bituminous spot repair, curb spot repairs, structure adjustments, traffic control, lawn restoration and all necessary appurtenances and restoration for said construction.
Posted Date
Apr 8, 2025
Due Date
Apr 29, 2025
Release: Apr 8, 2025
Close: Apr 29, 2025
Contract includes approx. 12,200 SY of roadway milling and profiling, 2 1/2" Superpave WMA binder course, 1 1/2" Superpave WMA wearing course, base repair, bituminous spot repair, curb spot repairs, structure adjustments, traffic control, lawn restoration and all necessary appurtenances and restoration for said construction.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis