Discover Opportunities months before the RFP drops
Learn more →Perform maintenance work along borough electric facilities, trimming or removing all trees, brush, and vines designated by the borough which interfere with existing electric distribution lines.
Posted Date
-
Due Date
Jan 12, 2026
Close: Jan 12, 2026
Perform maintenance work along borough electric facilities, trimming or removing all trees, brush, and vines designated by the borough which interfere with existing electric distribution lines.
AvailableProvide distribution circuits #2 and #6 relocation and upgrades.
Posted Date
Jun 26, 2025
Due Date
Jul 15, 2025
Release: Jun 26, 2025
Close: Jul 15, 2025
Provide distribution circuits #2 and #6 relocation and upgrades.
ADA ramp installations, storm water catch basin replacements, storm water pipe replacements, pavement base repairs, mechanical milling of approximately 14,000 SY of existing asphalt pavement surfaces, asphalt overlay approximately 14,000 SY of milled pavement surfaces, pavement markings, mobilization/demobilization, traffic control including establishment of approved detour routes and all else necessary or required to satisfactorily complete the project.
Posted Date
May 22, 2025
Due Date
Jun 17, 2025
Release: May 22, 2025
Close: Jun 17, 2025
ADA ramp installations, storm water catch basin replacements, storm water pipe replacements, pavement base repairs, mechanical milling of approximately 14,000 SY of existing asphalt pavement surfaces, asphalt overlay approximately 14,000 SY of milled pavement surfaces, pavement markings, mobilization/demobilization, traffic control including establishment of approved detour routes and all else necessary or required to satisfactorily complete the project.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis