Discover Opportunities months before the RFP drops
Learn more →This solicitation (IFB) requests proposals from General Contractors and Mechanical/Electrical contractors for exterior and interior renovations to the Haas Performing Arts Center at Bloomsburg University, including curtain wall assemblies, lighting, signage, sound booth, platform lift, acoustical treatments, partitions, millwork, ceilings, and related mechanical/electrical work. A mandatory pre-bid conference with a site visit is scheduled for Dec 18, 2025 at 10:00 AM at the Haas Mitrani Lobby; questions are due Dec 30, 2025. Electronic bids are due through PennBid by Jan 21, 2026 at 1:00 PM EDT; the opportunity is listed as Open and is NOT a grant.
Posted Date
Dec 8, 2025
Due Date
Jan 21, 2026
Release: Dec 8, 2025
Close: Jan 21, 2026
This solicitation (IFB) requests proposals from General Contractors and Mechanical/Electrical contractors for exterior and interior renovations to the Haas Performing Arts Center at Bloomsburg University, including curtain wall assemblies, lighting, signage, sound booth, platform lift, acoustical treatments, partitions, millwork, ceilings, and related mechanical/electrical work. A mandatory pre-bid conference with a site visit is scheduled for Dec 18, 2025 at 10:00 AM at the Haas Mitrani Lobby; questions are due Dec 30, 2025. Electronic bids are due through PennBid by Jan 21, 2026 at 1:00 PM EDT; the opportunity is listed as Open and is NOT a grant.
AvailableCommonwealth University of Pennsylvania – Bloomsburg Campus is soliciting bids to resurface the Scranton Commons roof, including membrane replacement, associated repairs, and limited mechanical/electrical work. Bids are submitted through PennBid and are due December 15, 2025 at 1:00 PM Eastern, with a mandatory pre‑bid meeting on November 18, 2025.
Posted Date
Nov 11, 2025
Due Date
Dec 15, 2025
Release: Nov 11, 2025
Close: Dec 15, 2025
Commonwealth University of Pennsylvania – Bloomsburg Campus is soliciting bids to resurface the Scranton Commons roof, including membrane replacement, associated repairs, and limited mechanical/electrical work. Bids are submitted through PennBid and are due December 15, 2025 at 1:00 PM Eastern, with a mandatory pre‑bid meeting on November 18, 2025.
AvailableWork included under this Project consists of Mechanical and Electrical Demolition of existing roof-mounted chiller, dunnage, chilled water piping, pumps, heat exchanger and electrical as required. Provide air-cooled pad-mounted scroll chiller including piping, supports, insulation, chiller, support pad, and equipment enclosure, chilled water buffer tank including pad support and tank insulation chiller water pumps, hydronic specialties, pads, insulation enclosures, and variable frequency drives, modifications to BAS for new chiller plant and testing, adjusting and balancing. Work for the Project shall be accomplished by Separate Prime Contractors according to Pennsylvania statute. The Lead Prime Contractor shall be the Mechanical Contractor. Specific instructions for coordination and responsibilities of the Lead Prime Contractor are contained in Section 0131000, Project Management and Coordination, and elsewhere throughout the Contract Documents.
Posted Date
Nov 13, 2025
Due Date
Jan 8, 2026
Release: Nov 13, 2025
Close: Jan 8, 2026
Work included under this Project consists of Mechanical and Electrical Demolition of existing roof-mounted chiller, dunnage, chilled water piping, pumps, heat exchanger and electrical as required. Provide air-cooled pad-mounted scroll chiller including piping, supports, insulation, chiller, support pad, and equipment enclosure, chilled water buffer tank including pad support and tank insulation chiller water pumps, hydronic specialties, pads, insulation enclosures, and variable frequency drives, modifications to BAS for new chiller plant and testing, adjusting and balancing. Work for the Project shall be accomplished by Separate Prime Contractors according to Pennsylvania statute. The Lead Prime Contractor shall be the Mechanical Contractor. Specific instructions for coordination and responsibilities of the Lead Prime Contractor are contained in Section 0131000, Project Management and Coordination, and elsewhere throughout the Contract Documents.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis