Discover Opportunities months before the RFP drops
Learn more →E the requirements for custodial services for one (1) school in the schools system.
Posted Date
Dec 25, 2025
Due Date
Dec 18, 2025
Release: Dec 25, 2025
Close: Dec 18, 2025
E the requirements for custodial services for one (1) school in the schools system.
AvailableSchool Bus Route Paving project consists of asphalt paving an existing gravel road around the southern portion of the school to create a new location for loading and unloading bus riders. Project also requires installation of a concrete dumpster pad, sidewalk removal and replacement, crack sealing and overlaying an existing asphalt ROTC Drill Pad, curb and gutter removal and replacement, and installation of an HDPE storm drain pipe. Other miscellaneous items include erosion control and traffic striping/markings).
Posted Date
Nov 29, 2025
Due Date
Dec 8, 2025
Release: Nov 29, 2025
Close: Dec 8, 2025
School Bus Route Paving project consists of asphalt paving an existing gravel road around the southern portion of the school to create a new location for loading and unloading bus riders. Project also requires installation of a concrete dumpster pad, sidewalk removal and replacement, crack sealing and overlaying an existing asphalt ROTC Drill Pad, curb and gutter removal and replacement, and installation of an HDPE storm drain pipe. Other miscellaneous items include erosion control and traffic striping/markings).
Project includes window replacement & auditorium seating replacement.
Posted Date
Apr 18, 2024
Due Date
Aug 21, 2025
Release: Apr 18, 2024
Close: Aug 21, 2025
Project includes window replacement & auditorium seating replacement.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis