Discover Opportunities months before the RFP drops
Learn more →Gym Floor Maintenance.
Posted Date
Dec 9, 2025
Due Date
Jan 9, 2026
Release: Dec 9, 2025
Close: Jan 9, 2026
Gym Floor Maintenance.
AvailablePlayground concrete, area includes approx. 7,100 SF, actual measurements are the responsibility of the proposer. Remove and haul off existing playground equipment. Excavate to a depth of 6". Add a 2" sand base. Prep, form, and pour concrete to a 4" depth to fill in the area currently bordered by a sidewalk. Finish level to match existing sidewalk. Appropriately pitch concrete to allow for adequate drainage. Concrete shall be 4000 psi mix. Score control joints and add expansion joints as required. Apply sealant to control joints as required. Remove forms. Haul off materials and spoils.
Posted Date
Nov 11, 2025
Due Date
Nov 20, 2025
Release: Nov 11, 2025
Close: Nov 20, 2025
Playground concrete, area includes approx. 7,100 SF, actual measurements are the responsibility of the proposer. Remove and haul off existing playground equipment. Excavate to a depth of 6". Add a 2" sand base. Prep, form, and pour concrete to a 4" depth to fill in the area currently bordered by a sidewalk. Finish level to match existing sidewalk. Appropriately pitch concrete to allow for adequate drainage. Concrete shall be 4000 psi mix. Score control joints and add expansion joints as required. Apply sealant to control joints as required. Remove forms. Haul off materials and spoils.
One Ton Maintenance Truck.
Posted Date
Nov 5, 2025
Due Date
Nov 20, 2025
Release: Nov 5, 2025
Close: Nov 20, 2025
One Ton Maintenance Truck.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis