Learn more →Work consists of repair of a sagging sewer line at high school. Work is marked with green paint. Repair will be done between 2 existing cleanouts. Cut and remove existing sagging section of sewer line from cleanout to cleanout replace removed section of pipe with appropriately sized sch 40 DWV pipe using proper couplings to connect repair to existing pipes. Add sand to the bottom of the trench to stabilize the pipe.
Posted Date
Nov 18, 2025
Due Date
Dec 10, 2025
Release: Nov 18, 2025
Close: Dec 10, 2025
Work consists of repair of a sagging sewer line at high school. Work is marked with green paint. Repair will be done between 2 existing cleanouts. Cut and remove existing sagging section of sewer line from cleanout to cleanout replace removed section of pipe with appropriately sized sch 40 DWV pipe using proper couplings to connect repair to existing pipes. Add sand to the bottom of the trench to stabilize the pipe.
Provide equipment for an on-premise, district-wide network upgrade. 20gbps aggregated internet and 10gbps WAN connections from each of its 20 school sites, aggregating at the District Office. Includes, 30 - JL659A HPE ANW 6300M 48SR5 Class 6 PoE 4-port SFP56; 60 - JL087A HPE ANW X372 54VDC 1050W PSU; 60 - JL485A HPE ANW 25G SFP28 LC eSR 400M MMF Transceiver; 30 - Q9Y80AAE HPE Aruba Central Class-3 Foundation 5-Yr License.
Posted Date
Oct 22, 2025
Due Date
Nov 21, 2025
Release: Oct 22, 2025
Close: Nov 21, 2025
Provide equipment for an on-premise, district-wide network upgrade. 20gbps aggregated internet and 10gbps WAN connections from each of its 20 school sites, aggregating at the District Office. Includes, 30 - JL659A HPE ANW 6300M 48SR5 Class 6 PoE 4-port SFP56; 60 - JL087A HPE ANW X372 54VDC 1050W PSU; 60 - JL485A HPE ANW 25G SFP28 LC eSR 400M MMF Transceiver; 30 - Q9Y80AAE HPE Aruba Central Class-3 Foundation 5-Yr License.
Work consists of installation of six (6) chargepoint CP6000 dual port EV charging stations at transportation yard.
Posted Date
Oct 27, 2025
Due Date
Nov 20, 2025
Release: Oct 27, 2025
Close: Nov 20, 2025
Work consists of installation of six (6) chargepoint CP6000 dual port EV charging stations at transportation yard.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis