Discover Opportunities months before the RFP drops
Learn more →Brief project description: minor demolition; carpentry work; batt insulation; flashings, trim and sealants; replace existing entrance doors, door frames and hardware; gypsum board patching and taping; painting; HVAC systems - replace existing boiler with ducted furnace system, duct work distribution; new fans; electrical work - electrical connections and controls for HVAC system; new wiring from existing panel through wire mold, painted.
Posted Date
Dec 8, 2025
Due Date
Jan 7, 2026
Release: Dec 8, 2025
Close: Jan 7, 2026
Brief project description: minor demolition; carpentry work; batt insulation; flashings, trim and sealants; replace existing entrance doors, door frames and hardware; gypsum board patching and taping; painting; HVAC systems - replace existing boiler with ducted furnace system, duct work distribution; new fans; electrical work - electrical connections and controls for HVAC system; new wiring from existing panel through wire mold, painted.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis