Discover Opportunities months before the RFP drops
Learn more →Work includes approx. to resurface playgrounds along with playground equipment changes. See outside link for more details.
Posted Date
Oct 21, 2025
Due Date
Dec 15, 2025
Release: Oct 21, 2025
Close: Dec 15, 2025
Work includes approx. to resurface playgrounds along with playground equipment changes. See outside link for more details.
AvailableSeeking to engage a professional services firm to provide services to design, bid and provide services for construction administration for improvements.
Posted Date
Oct 16, 2025
Due Date
Nov 28, 2025
Release: Oct 16, 2025
Close: Nov 28, 2025
Seeking to engage a professional services firm to provide services to design, bid and provide services for construction administration for improvements.
Project consist of Demolition and Site Preparation. Remove existing asphalt in the designated areas and legally dispose of all materials. Grade and compact subgrade for rock, sidewalk, and planting areas as required. Concrete and Drainage. Install new concrete sidewalk meeting ADA standards and local codes. Install domed drainage grates in low-lying areas for proper water management. Landscaping and Irrigation. Install rock and rock edging consistent with district design standards. Install a drip irrigation system designed for water efficiency and proper coverage of all plantings. Plant (7) 2" caliper crab apple trees, 21 ornamental grasses, and twenty-one 1-gallon shrubs, species and locations to be approved by ACSD#1 prior to installation. Apply weed barrier fabric beneath all rock and mulch areas
Posted Date
Oct 16, 2025
Due Date
Dec 4, 2025
Release: Oct 16, 2025
Close: Dec 4, 2025
Project consist of Demolition and Site Preparation. Remove existing asphalt in the designated areas and legally dispose of all materials. Grade and compact subgrade for rock, sidewalk, and planting areas as required. Concrete and Drainage. Install new concrete sidewalk meeting ADA standards and local codes. Install domed drainage grates in low-lying areas for proper water management. Landscaping and Irrigation. Install rock and rock edging consistent with district design standards. Install a drip irrigation system designed for water efficiency and proper coverage of all plantings. Plant (7) 2" caliper crab apple trees, 21 ornamental grasses, and twenty-one 1-gallon shrubs, species and locations to be approved by ACSD#1 prior to installation. Apply weed barrier fabric beneath all rock and mulch areas
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis