Discover Opportunities months before the RFP drops
Learn more →Removal and replacement of the sewer lines. This project will focus on removal and replacement of the main trunk line in the crawlspace area along with all lateral drains and waste lines. The waste line system is composed of 2", 3", and 4", pipes. This facility has approx. 170' of 2" pipe, 130' of 3" pipe, and 120' of four-inch cast iron pipe in the crawl space per building. Contractor to verify measurements for successful bid. Removal where DWV pipe is accessible to be deconstructed, removed from crawlspace, disposed of properly, and replaced with appropriately sized ABS piping. Existing DWV pipes to be cut 6" below the subfloor decking of crawlspace. Replacement of new piping shall be installed as practicable with connecting components "like sizes and types for like sizes and types" (i.e., T's, Y's, couplers, extensions, etc.) at the 6" line to ensure positive slope requirements to city drain/waste line at final termination point of the building to city sewer line. The above length measurements do not account for fittings installed, soil stacks, and vent stacks. Awarded contractor to verify quantities. Clean outs to the main trunk line are to be installed to the 4" main sewer line.
Posted Date
Oct 21, 2025
Due Date
Nov 19, 2025
Release: Oct 21, 2025
Close: Nov 19, 2025
Removal and replacement of the sewer lines. This project will focus on removal and replacement of the main trunk line in the crawlspace area along with all lateral drains and waste lines. The waste line system is composed of 2", 3", and 4", pipes. This facility has approx. 170' of 2" pipe, 130' of 3" pipe, and 120' of four-inch cast iron pipe in the crawl space per building. Contractor to verify measurements for successful bid. Removal where DWV pipe is accessible to be deconstructed, removed from crawlspace, disposed of properly, and replaced with appropriately sized ABS piping. Existing DWV pipes to be cut 6" below the subfloor decking of crawlspace. Replacement of new piping shall be installed as practicable with connecting components "like sizes and types for like sizes and types" (i.e., T's, Y's, couplers, extensions, etc.) at the 6" line to ensure positive slope requirements to city drain/waste line at final termination point of the building to city sewer line. The above length measurements do not account for fittings installed, soil stacks, and vent stacks. Awarded contractor to verify quantities. Clean outs to the main trunk line are to be installed to the 4" main sewer line.
Provide weatherization services to qualified homeowners and renters consistent with established AHFC program policies and procedures.
Posted Date
Aug 14, 2025
Due Date
Oct 16, 2025
Release: Aug 14, 2025
Close: Oct 16, 2025
Provide weatherization services to qualified homeowners and renters consistent with established AHFC program policies and procedures.
Exterior building cleaning. This includes all windows, glazing, frames, mullions, exterior siding, spandrels, doors, garage doors, soffits, and fascia.
Posted Date
Aug 14, 2025
Due Date
Oct 7, 2025
Release: Aug 14, 2025
Close: Oct 7, 2025
Exterior building cleaning. This includes all windows, glazing, frames, mullions, exterior siding, spandrels, doors, garage doors, soffits, and fascia.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis