Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
250-Network Contract Office 10 (36C250)
The Contractor shall demolish and replace overhead dry fire sprinkler piping and dry standpipe piping and associated components within the underground patient parking garage. The Contractor shall demolish and replace system piping and components including header, risers, DPV’s, trim, fittings, hangers, sprinklers, and all other associated components.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
250-Network Contract Office 10 (36C250)
Repair parking garage tendon. This repair will correct the damaged parking garage tendons and will help restore the parking garage to its pre-damaged condition, therefore, slowing additional degradation of the structure as a result of the damaged tendons and extending its useful life
Posted Date
Oct 30, 2025
Due Date
Dec 22, 2025
Release: Oct 30, 2025
250-Network Contract Office 10 (36C250)
Close: Dec 22, 2025
Repair parking garage tendon. This repair will correct the damaged parking garage tendons and will help restore the parking garage to its pre-damaged condition, therefore, slowing additional degradation of the structure as a result of the damaged tendons and extending its useful life
AvailableHouston Community College
Houston Community College seeks bids to furnish and install a complete Parking Access and Revenue Control System (PARCS) at the System Administration Parking Garage at 3200 Main Street, Houston, TX. The project replaces outdated parking control equipment and infrastructure across approximately 1,481,151 square feet of parking space.
Posted Date
Sep 23, 2025
Due Date
Dec 4, 2025
Release: Sep 23, 2025
Houston Community College
Close: Dec 4, 2025
Houston Community College seeks bids to furnish and install a complete Parking Access and Revenue Control System (PARCS) at the System Administration Parking Garage at 3200 Main Street, Houston, TX. The project replaces outdated parking control equipment and infrastructure across approximately 1,481,151 square feet of parking space.
AvailableCity of Baltimore
Project includes replace the obsolete sprinkler system in the forrest street garage and install a new electric fire pump system at the monument street warehouse to serve the entire complex (garage, warehouse, and office building). The demolition subcontractor shall provide all labor, equipment, and means necessary to perform selective demolition and removal work. See outside link.
Posted Date
Oct 27, 2025
Due Date
Nov 24, 2025
Release: Oct 27, 2025
City of Baltimore
Close: Nov 24, 2025
Project includes replace the obsolete sprinkler system in the forrest street garage and install a new electric fire pump system at the monument street warehouse to serve the entire complex (garage, warehouse, and office building). The demolition subcontractor shall provide all labor, equipment, and means necessary to perform selective demolition and removal work. See outside link.
Available260-Network Contract Office 20 (36C260)
Replace HVAC B23-B45.The puropse of this project is to replace the fan coil units and fin tube radiators throughout buildings 23 and 45 at BVAMC. Heat exchangers, pumps, and valves will be installed to create a closed heating loop in in the buildings. The raw geothermal water that currently runs throughout the buildings will be used to heat the closed heating loop which will reduce the wear that occurs in the piping and equipment by the raw geothermal water. New piping will be installed where needed. Old piping removed. All necessary connections, valves, structure modifications, and accessories shall be included. See attached file.
Posted Date
Nov 7, 2025
Due Date
Dec 8, 2025
Release: Nov 7, 2025
260-Network Contract Office 20 (36C260)
Close: Dec 8, 2025
Replace HVAC B23-B45.The puropse of this project is to replace the fan coil units and fin tube radiators throughout buildings 23 and 45 at BVAMC. Heat exchangers, pumps, and valves will be installed to create a closed heating loop in in the buildings. The raw geothermal water that currently runs throughout the buildings will be used to heat the closed heating loop which will reduce the wear that occurs in the piping and equipment by the raw geothermal water. New piping will be installed where needed. Old piping removed. All necessary connections, valves, structure modifications, and accessories shall be included. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis