Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
248-Network Contract Office 8 (36C248)
Provide all labor, tools, and materials necessary for the following work: bid-build project to install a new water monitoring system.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
248-Network Contract Office 8 (36C248)
Demolition and removal of existing structures, and furnish labor and materials and perform work.
Posted Date
Sep 2, 2025
Due Date
Dec 17, 2025
Release: Sep 2, 2025
248-Network Contract Office 8 (36C248)
Close: Dec 17, 2025
Demolition and removal of existing structures, and furnish labor and materials and perform work.
Available248-Network Contract Office 8 (36C248)
Replace locate chilled water piping.
Posted Date
Sep 2, 2025
Due Date
Dec 5, 2025
Release: Sep 2, 2025
248-Network Contract Office 8 (36C248)
Close: Dec 5, 2025
Replace locate chilled water piping.
Available248-Network Contract Office 8 (36C248)
Demolition and removal of existing structures, and furnish labor and materials and perform work for climatize building 78.
Posted Date
Oct 28, 2025
Due Date
Dec 5, 2025
Release: Oct 28, 2025
248-Network Contract Office 8 (36C248)
Close: Dec 5, 2025
Demolition and removal of existing structures, and furnish labor and materials and perform work for climatize building 78.
Available248-Network Contract Office 8 (36C248)
Provide all labor, tools, and materials necessary for the following work: bid-build project to provide structural repairs of critical areas in the crawl and basement space of building 1. Repairs, temporary shoring during construction and special inspections from a florida pe certified special inspector are required for this project.
Posted Date
Nov 13, 2025
Due Date
Nov 27, 2025
Release: Nov 13, 2025
248-Network Contract Office 8 (36C248)
Close: Nov 27, 2025
Provide all labor, tools, and materials necessary for the following work: bid-build project to provide structural repairs of critical areas in the crawl and basement space of building 1. Repairs, temporary shoring during construction and special inspections from a florida pe certified special inspector are required for this project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis