Retrieving RFP details
Release
Close
Town of North Attleborough
Seeking Wastewater Treatment Facility Grit & Screening Removal Project.
City of Seaford
WWTF generally consists of, but is not limited to, the construction/installation of: headworks structure and primary screening improvements, influent pumping station rehabilitation, a new grit removal / handling structure including flow splitter box and provisions for future secondary screening equipment, rehabilitation of both primary clarifiers, a new septage handling facility, electrical power, mechanical (hvac) and controls / scada improvements necessary to serve proposed improvement areas, necessary site work and stormwater management improvements, and sea level rise mitigation measures.
DLA Maritime
Qty 20 drum - grit, ferrous metallic abrasive, steel, 50 grit, size g50, 55-gal drum (approx 1600 lbs), sds required. Grit, steel grit, ferrous metallic abrasive, steel, 50 grit, size g50, 55-gal drum (approx 1600 lbs).
City of Newberry
Wastewater treatment facility (WWTF) expansion.
Release
Oct 22, 2025
Close
Nov 20, 2025