City of Wyoming
The Work includes the following major items: Removal and replacement of 4 HSP discharge valves and associated electric actuators. New valves and actuators furnished by Owner, installed by contractor; Recoating of associated HSP discharge piping and fittings; Installation of 4 battery panels.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Anne Arundel County
Expansion of the existing 15-MGD water treatment plant (with 20-mgd headworks) on Riedel Road, Crofton Meadows, Maryland to 20-MGD nominal capacity. The work includes, but is not limited to, constructing new aerators, flocculation basins, sedimentation basins, filters, thickener, clearwell, high lift pumping station upgrade, backwash holding tank, backwash surge tank upgrades, generators, chemical systems upgrade, yard piping, dewatering, grading, site work, paving and landscaping. Furnish and install all equipment, materials, labor, structures, site work, piping, test pits, testing, accessories, appurtenances and all other required work.
Posted Date
Nov 3, 2025
Due Date
Dec 9, 2025
Release: Nov 3, 2025
Anne Arundel County
Close: Dec 9, 2025
Expansion of the existing 15-MGD water treatment plant (with 20-mgd headworks) on Riedel Road, Crofton Meadows, Maryland to 20-MGD nominal capacity. The work includes, but is not limited to, constructing new aerators, flocculation basins, sedimentation basins, filters, thickener, clearwell, high lift pumping station upgrade, backwash holding tank, backwash surge tank upgrades, generators, chemical systems upgrade, yard piping, dewatering, grading, site work, paving and landscaping. Furnish and install all equipment, materials, labor, structures, site work, piping, test pits, testing, accessories, appurtenances and all other required work.
AvailableIncline Village General Improvement District
Work consists of Construction of the Incline Bike Park Phase II improvements.
Posted Date
Nov 7, 2025
Due Date
Nov 25, 2025
Release: Nov 7, 2025
Incline Village General Improvement District
Close: Nov 25, 2025
Work consists of Construction of the Incline Bike Park Phase II improvements.
AvailableCity of Sylvester
Construction of phase II of the Quail Pines Subdivision to include approximately 74,240 SF of asphalt paved streets with roadside ditches. 3,405 LF of 6" water main with valves, fire hydrants and other appurtenances. 3,550 LF if 8" gravity sewer with manholes and service connection. Sewer pump station, 1,518 LF of 4" sewer force main. clearing grubbing and grading of lots and common areas.
Posted Date
Nov 3, 2025
Due Date
Dec 9, 2025
Release: Nov 3, 2025
City of Sylvester
Close: Dec 9, 2025
Construction of phase II of the Quail Pines Subdivision to include approximately 74,240 SF of asphalt paved streets with roadside ditches. 3,405 LF of 6" water main with valves, fire hydrants and other appurtenances. 3,550 LF if 8" gravity sewer with manholes and service connection. Sewer pump station, 1,518 LF of 4" sewer force main. clearing grubbing and grading of lots and common areas.
AvailableU.S. Army Engineer District Chicago
Provide upper des plaines river and tributaries phase II aquatic ecosystem restoration phase II. The project involves restoring approximately 429 acres of historically significant natural communities, including wetlands, prairies, savannas, woodlands, and stream habitats. Major actions include remaindering hastings creek, eradicating invasive plant species, restoring instream habitat, disabling existing agricultural drain tiles, and establishing native plant communities based on site-specific hydrology and topography.
Posted Date
Nov 4, 2025
Due Date
Nov 19, 2025
Release: Nov 4, 2025
U.S. Army Engineer District Chicago
Close: Nov 19, 2025
Provide upper des plaines river and tributaries phase II aquatic ecosystem restoration phase II. The project involves restoring approximately 429 acres of historically significant natural communities, including wetlands, prairies, savannas, woodlands, and stream habitats. Major actions include remaindering hastings creek, eradicating invasive plant species, restoring instream habitat, disabling existing agricultural drain tiles, and establishing native plant communities based on site-specific hydrology and topography.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis