Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Des Moines
Work includes 380 SY subbase, special backfill, 6"; 1,180 TON trench foundation; 3 EA special pipe embedment, utility support; 17 EA special pipe embedment or encasement, trench waterstop; 4,180 LF special pipe embedment or encasement, trench backfill; 575 LF special pipe encasement, concrete creek crossing; 152 LF sanitary sewer, trenched, 10"; 13,256 LF sanitary sewer, trenched, frpmp, 60"; 40 LF remove and replace sanitary service, dip, 6"; 48 LF remove and replace storm sewer, RCP, 12"; 36 LF remove and replace storm sewer, RCP, 15"; 84 LF remove and replace storm sewer, RCP, 18"; 30 LF remove and replace storm sewer, rcp, 24"; 42 LF remove and replace storm sewer, CMP, 42"; 4 EA pipe apron, RCP, 18 ". See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Sanitation Districts Of Los Angeles County
Rehabilitate approx. 4,161' of existing corroded 18- and 24" dia. reinforced concrete pipe (RCP) and cracked vitrified clay pipe (VCP) on the joint outfall H unit 8L trunk sewer and the joint outfall H unit 8L relief trunk sewer with cured-in-place pipe liner and 14 manholes with a protective coating system and all appurtenant work.
Posted Date
Nov 5, 2025
Due Date
Dec 9, 2025
Release: Nov 5, 2025
Sanitation Districts Of Los Angeles County
Close: Dec 9, 2025
Rehabilitate approx. 4,161' of existing corroded 18- and 24" dia. reinforced concrete pipe (RCP) and cracked vitrified clay pipe (VCP) on the joint outfall H unit 8L trunk sewer and the joint outfall H unit 8L relief trunk sewer with cured-in-place pipe liner and 14 manholes with a protective coating system and all appurtenant work.
AvailableCity of Kenton
Project includes 89 CY asphalt concrete base, pg64-22, (449); 87 CY asphalt concrete intermediate course, type 2, (449); 14 CY 6" non-reinforced concrete pavement; 235 SF 4" concrete walk; see outside link.
Posted Date
Oct 29, 2025
Due Date
Nov 20, 2025
Release: Oct 29, 2025
City of Kenton
Close: Nov 20, 2025
Project includes 89 CY asphalt concrete base, pg64-22, (449); 87 CY asphalt concrete intermediate course, type 2, (449); 14 CY 6" non-reinforced concrete pavement; 235 SF 4" concrete walk; see outside link.
AvailableOrange County
Work consist of shingle creek regional trail.
Posted Date
Nov 6, 2025
Due Date
Dec 18, 2025
Release: Nov 6, 2025
Orange County
Close: Dec 18, 2025
Work consist of shingle creek regional trail.
AvailableCity of Springfield
Work consists of 5,800 SY Gravel Access Road; 80 CY Rock Excavation; 5,426 sf Mainline Video Inspection; 400 CY Trench Foundation; 36 SF 18" CMP Culvert Pipe; 445 SF 18" ASTM F679 PS 115 PVC Pipe (in 36" Casing); 5 EA Concrete Manholes, 48".
Posted Date
Oct 31, 2025
Due Date
Dec 2, 2025
Release: Oct 31, 2025
City of Springfield
Close: Dec 2, 2025
Work consists of 5,800 SY Gravel Access Road; 80 CY Rock Excavation; 5,426 sf Mainline Video Inspection; 400 CY Trench Foundation; 36 SF 18" CMP Culvert Pipe; 445 SF 18" ASTM F679 PS 115 PVC Pipe (in 36" Casing); 5 EA Concrete Manholes, 48".
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis