Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Calallen Independent School District
Project consists of replacement of existing HVAC split DX and packaged units with new, installation of new HVAC equipment, general roofing repairs for HVAC, electrical and BAS support connections and general construction work
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
NJ Division of Property Management & Construction
Work includes AHU replacements and HVAC upgrades.
Posted Date
Jul 30, 2025
Due Date
Dec 18, 2025
Release: Jul 30, 2025
NJ Division of Property Management & Construction
Close: Dec 18, 2025
Work includes AHU replacements and HVAC upgrades.
AvailableFort Zumwalt School District R-2
Work included in this Project involves HVAC equipment replacement work at four (4) of the school district’s buildings. The HVAC replacements at these four (4) school buildings have been grouped into four (4) separate Bid Packages, and bidders are encouraged to submit bids on all four (4) Bid Packages. However, to help ensure that adequate manpower is assigned and the HVAC replacements are completed within the scheduled time frame, the Owner reserves the right to award only one Bid Package to a bidder. Bidders submitting a bid for a particular Bid Package are entirely responsible for providing all labor, materials, equipment and supervision to properly complete that Bid Package. Bidder are to include in their bids the allowances listed later in the Section. Lastly, if the contractor is awarded multiple bid packages, the contractor shall have a dedicated project supervisor for each site.
Posted Date
Nov 10, 2025
Due Date
Dec 3, 2025
Release: Nov 10, 2025
Fort Zumwalt School District R-2
Close: Dec 3, 2025
Work included in this Project involves HVAC equipment replacement work at four (4) of the school district’s buildings. The HVAC replacements at these four (4) school buildings have been grouped into four (4) separate Bid Packages, and bidders are encouraged to submit bids on all four (4) Bid Packages. However, to help ensure that adequate manpower is assigned and the HVAC replacements are completed within the scheduled time frame, the Owner reserves the right to award only one Bid Package to a bidder. Bidders submitting a bid for a particular Bid Package are entirely responsible for providing all labor, materials, equipment and supervision to properly complete that Bid Package. Bidder are to include in their bids the allowances listed later in the Section. Lastly, if the contractor is awarded multiple bid packages, the contractor shall have a dedicated project supervisor for each site.
AvailableBeauregard Parish School District
Phase II for HVAC upgrades at various schools throughout the school system.
Posted Date
Oct 24, 2025
Due Date
Nov 20, 2025
Release: Oct 24, 2025
Beauregard Parish School District
Close: Nov 20, 2025
Phase II for HVAC upgrades at various schools throughout the school system.
AvailableTyler Independent School District
2026 HVAC Renovations.
Posted Date
Nov 16, 2025
Due Date
Dec 9, 2025
Release: Nov 16, 2025
Tyler Independent School District
Close: Dec 9, 2025
2026 HVAC Renovations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis