Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Gardner
The City of Gardner, Kansas requests proposals from qualified design-build contractors to design and construct a new playground at Winwood Park, including playground equipment, turf safety surfacing, and associated site work. Proposals are due 12/09/2025 at 10:00 AM CST; see the bid source link for full documentation and submittal instructions.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Gardner
Design-Build. Seeking qualified and experienced design-build contractors for the design and construction of a new park playground. The project will include the design, supply, and installation of playground equipment, turf safety surfacing, and associated site work such as trail/sidewalk repair and minor grading as needed.
Posted Date
Nov 18, 2025
Due Date
Dec 9, 2025
Release: Nov 18, 2025
City of Gardner
Close: Dec 9, 2025
Design-Build. Seeking qualified and experienced design-build contractors for the design and construction of a new park playground. The project will include the design, supply, and installation of playground equipment, turf safety surfacing, and associated site work such as trail/sidewalk repair and minor grading as needed.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Estes Park
DESIGN/BUILD: Upgrade building entrance: modify the existing access points to the playground from the rear door to include a wheelchair-accessible ramp. Improve surfacing: install ADA-compliant surfacing materials that provide a safe and accessible path throughout the playground. Create inclusive play areas: include play areas for children with varying abilities, ensuring all children can interact and play together. Construct an ADA-compliant ramp at the rear childcare facility entrance. Remove and dispose of outdated play structures and surfacing. Upgrade exterior areas (pathways, signage, landscaping) for accessibility.
Posted Date
Dec 2, 2025
Due Date
Jan 8, 2026
Release: Dec 2, 2025
Town of Estes Park
Close: Jan 8, 2026
DESIGN/BUILD: Upgrade building entrance: modify the existing access points to the playground from the rear door to include a wheelchair-accessible ramp. Improve surfacing: install ADA-compliant surfacing materials that provide a safe and accessible path throughout the playground. Create inclusive play areas: include play areas for children with varying abilities, ensuring all children can interact and play together. Construct an ADA-compliant ramp at the rear childcare facility entrance. Remove and dispose of outdated play structures and surfacing. Upgrade exterior areas (pathways, signage, landscaping) for accessibility.
AvailablePort Moody
The City of Port Moody seeks a qualified contractor under a design-build contract to refine playground concepts, confirm a suitable design, supply and install a playground at Art Wilkinson Park and to prepare a completion report at project close-out. Submissions are online only and the bid closing is scheduled for Dec 5, 2025 at 2:00 PM PST (2025-12-05T22:00:00Z).
Posted Date
-
Due Date
Dec 5, 2025
Port Moody
Close: Dec 5, 2025
The City of Port Moody seeks a qualified contractor under a design-build contract to refine playground concepts, confirm a suitable design, supply and install a playground at Art Wilkinson Park and to prepare a completion report at project close-out. Submissions are online only and the bid closing is scheduled for Dec 5, 2025 at 2:00 PM PST (2025-12-05T22:00:00Z).
AvailableCity of De Soto
Riverfest Park Soccer Renovation Design - Build.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
City of De Soto
Close: Dec 18, 2025
Riverfest Park Soccer Renovation Design - Build.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →