Retrieving RFP details
Release
Close
City of Winston-Salem
Work includes removal of the existing roof and installation of new roof on the clubhouse.
WebAd - WLGC Clubhouse Roof Replacement - IF2670
Winston County School District
Winston co system wide intercom replacement.
Winston Dillard Water District
Removal and disposal of existing 1 MG riveted steel tank and appurtenances including piping, valves and vault at Winston Site. Installation of temporary shoring wall to protect existing 0.5 MG steel bolted tank at Winston Site during construction. Removal, disposal of existing 0.5 MG steel bolted tank and appurtenances at Winston Site. Site preparation, schedule coordination and construction coordination of the new 2.0 MG glss fused steel bolted tank and appurtenances. Tank has been pre-procured per the scope between the Owner and Tank Supplier at the Winston Site. Furnish and install new valve vault, valves, manholes, piping and all other appurtenances. Furnish and install of new Electrical and Supervisory Control and Data Acquisition (SCADA) system equipment at Winston and Dillard Sites. Procurement shall be contracted through Owner's Integrator, Control Systems Northwest. System Integration will be conducted by Owner's Integrator through Owner's contract. Furnish and install Electrical Mixing System at Winston Site and Solar Mixing System at the Dillard Site. Furnish and install a new valve vault and appurtenances, a new hatch with interior ladder and interior coating (floor, 3' from floor and spot coating) at Dillard Site as described on the Bidding Documents. Site grading and restoration. See attached file.
U.S. Army Engineer District New England
Furnish all labor, materials, equipment, tools, and supervision, necessary to remove and replace an existing asphalt roof. Work will include removal of the existing asphalt roof, any water damaged plywood and sheathing (estimated not to exceed ten-percent of the existing roof), gravity fed turbine vent, and gutter system and installation of a new architectural shingle roof, underlayment, ice and water shield, flashing, gravity fed turbine vent and compatible gutter system on the Colebrook River Lake Dam project office and attached garage. The work shall be performed in accordance with all applicable federal, state, and local codes, standards, and regulations, including, but not limited to the International Building Code (IBC), International Energy Conservation Code (IECC), and manufacturer’s specifications. Old asphalt shingles shall be recycled at an approved facility (see portal.ct.gov), for information on Asphalt Roofing Shingle Recycling and approved facilities.
Release
Oct 07, 2025
Close
Nov 06, 2025