Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Iowa Department of Agriculture and Land Stewardship
Work includes 1 LS of site stripping & preparation; 1 LS of mobilization and demobilization; 6,608 sf of tied concrete block mat; 170 EA of tied concrete block mat: u-anchors; 220 EA of tied concrete block mat: cross plate percussion anchors; 2,702 CY of excavation; 762 CY of earthfill (general); 19,564 SY of 12" pond liner; 22 CY of drainfill, fine; 3,868 CY of topsoil strip, salvage, and respread; 40 lf of corrugated dual-wall hdpe: 8" nonperforated; 440 LF of corrugated dual-wall hdpe: 8" perforated; etc, see attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Iowa Department of Agriculture and Land Stewardship
Work includes 1 LS of site stripping & preparation; 1 LS of mobilization and demobilization; 6,608 sf of tied concrete block mat; 170 EA of tied concrete block mat: u-anchors; 220 EA of tied concrete block mat: cross plate percussion anchors; 2,702 CY of excavation; 762 CY of earthfill (general); 19,564 SY of 12" pond liner; 22 CY of drainfill, fine; 3,868 CY of topsoil strip, salvage, and respread; 40 lf of corrugated dual-wall hdpe: 8" nonperforated; 440 LF of corrugated dual-wall hdpe: 8" perforated; etc, see attached file.
Posted Date
-
Due Date
Dec 17, 2025
Iowa Department of Agriculture and Land Stewardship
Close: Dec 17, 2025
Work includes 1 LS of site stripping & preparation; 1 LS of mobilization and demobilization; 6,608 sf of tied concrete block mat; 170 EA of tied concrete block mat: u-anchors; 220 EA of tied concrete block mat: cross plate percussion anchors; 2,702 CY of excavation; 762 CY of earthfill (general); 19,564 SY of 12" pond liner; 22 CY of drainfill, fine; 3,868 CY of topsoil strip, salvage, and respread; 40 lf of corrugated dual-wall hdpe: 8" nonperforated; 440 LF of corrugated dual-wall hdpe: 8" perforated; etc, see attached file.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Iowa Department of Agriculture and Land Stewardship
Project is for a traditional breakpoint nutrient reduction wetland. In general, the work involves, but is not limited to, selective clearing, excavation, grading, steel sheetpile installation, tile installation, water control structure and seeding. This project includes about 18,700 cubic yards of earthwork, installation of 1,403 SF of steel sheetpile, water control structure, 385 LF of tile installation, 116 LF of drawdown pipe, 920 TN of riprap and clean stone, 115 cubic yards of concrete grout and 8.7 acres of seeding.
Posted Date
Nov 14, 2025
Due Date
Dec 17, 2025
Release: Nov 14, 2025
Iowa Department of Agriculture and Land Stewardship
Close: Dec 17, 2025
Project is for a traditional breakpoint nutrient reduction wetland. In general, the work involves, but is not limited to, selective clearing, excavation, grading, steel sheetpile installation, tile installation, water control structure and seeding. This project includes about 18,700 cubic yards of earthwork, installation of 1,403 SF of steel sheetpile, water control structure, 385 LF of tile installation, 116 LF of drawdown pipe, 920 TN of riprap and clean stone, 115 cubic yards of concrete grout and 8.7 acres of seeding.
AvailableIowa Department of Agriculture and Land Stewardship
Work includes 1 LS of stripping; 1 LS of mobilization & demobilization; 2,172 SF of steel sheet piling; 979 CY of excavation (general); 1,348 CY of earthfill (general); 337 CY of earthfill (general dam); 826 CY of earthfill (dam core); 151 LF of 12" hdpe dual-wall; 672 TN of riprap (ia dot class e); 118 CY of concrete grout; etc, see attached file.
Posted Date
-
Due Date
Dec 17, 2025
Iowa Department of Agriculture and Land Stewardship
Close: Dec 17, 2025
Work includes 1 LS of stripping; 1 LS of mobilization & demobilization; 2,172 SF of steel sheet piling; 979 CY of excavation (general); 1,348 CY of earthfill (general); 337 CY of earthfill (general dam); 826 CY of earthfill (dam core); 151 LF of 12" hdpe dual-wall; 672 TN of riprap (ia dot class e); 118 CY of concrete grout; etc, see attached file.
AvailableIowa Department of Agriculture and Land Stewardship
Work includes 1 LS of stripping; 1 LS of mobilization & demobilization; 2,172 SF of steel sheet piling; 979 CY of excavation (general); 1,348 CY of earthfill (general); 337 CY of earthfill (general dam); 826 CY of earthfill (dam core); 151 LF of 12" hdpe dual-wall; 672 TN of riprap (ia dot class e); 118 CY of concrete grout; etc, see attached file.
Posted Date
-
Due Date
Dec 17, 2025
Iowa Department of Agriculture and Land Stewardship
Close: Dec 17, 2025
Work includes 1 LS of stripping; 1 LS of mobilization & demobilization; 2,172 SF of steel sheet piling; 979 CY of excavation (general); 1,348 CY of earthfill (general); 337 CY of earthfill (general dam); 826 CY of earthfill (dam core); 151 LF of 12" hdpe dual-wall; 672 TN of riprap (ia dot class e); 118 CY of concrete grout; etc, see attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.