Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Virginia Department of Health
Provide well installation and well abandonment.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Lansing
Work includes: abandoning BWL Wells 85-01, 85-02, and 85-03, which are screened Type 1 community wells with no pumps or internal equipment and equipped with pitless adapters. Work includes full mobilization, setup, abandonment to grade, demobilization, and reporting the abandoned status to the State of Michigan in accordance with the Michigan Water Well Construction and Pump Installation Code (Part 127, Act 368, PA 1978; Rules R 325.1662–1670). Contractor must provide lump-sum pricing based on existing well information, supply unit pricing per cubic foot of fill material for volume variances, account for 20% grout loss through the screen, and save/present cement/material slips for verification. Expected fill volumes are 657.38 ft³ for Well 85-01, 150.21 ft³ for Well 85-02, and 185.55 ft³ for Well 85-03.
Posted Date
Nov 18, 2025
Due Date
Dec 19, 2025
Release: Nov 18, 2025
City of Lansing
Close: Dec 19, 2025
Work includes: abandoning BWL Wells 85-01, 85-02, and 85-03, which are screened Type 1 community wells with no pumps or internal equipment and equipped with pitless adapters. Work includes full mobilization, setup, abandonment to grade, demobilization, and reporting the abandoned status to the State of Michigan in accordance with the Michigan Water Well Construction and Pump Installation Code (Part 127, Act 368, PA 1978; Rules R 325.1662–1670). Contractor must provide lump-sum pricing based on existing well information, supply unit pricing per cubic foot of fill material for volume variances, account for 20% grout loss through the screen, and save/present cement/material slips for verification. Expected fill volumes are 657.38 ft³ for Well 85-01, 150.21 ft³ for Well 85-02, and 185.55 ft³ for Well 85-03.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Polk County Conservation Board
Project includes abandonment of two well.
Posted Date
Dec 4, 2025
Due Date
Jan 2, 2026
Release: Dec 4, 2025
Polk County Conservation Board
Close: Jan 2, 2026
Project includes abandonment of two well.
AvailableLansing Board of Water & Light
The Lansing Board of Water & Light (BWL) seeks a contractor to abandon three groundwater wells (85-01, 85-02, 85-03) including mobilization, abandonment to grade, demobilization, and reporting to the State of Michigan. Bids are evaluated on price, unit pricing, experience, acceptance of terms, schedule, and competitiveness, and work is expected to be completed before April 30, 2026.
Posted Date
Nov 18, 2025
Due Date
Dec 19, 2025
Release: Nov 18, 2025
Lansing Board of Water & Light
Close: Dec 19, 2025
The Lansing Board of Water & Light (BWL) seeks a contractor to abandon three groundwater wells (85-01, 85-02, 85-03) including mobilization, abandonment to grade, demobilization, and reporting to the State of Michigan. Bids are evaluated on price, unit pricing, experience, acceptance of terms, schedule, and competitiveness, and work is expected to be completed before April 30, 2026.
AvailableCity of Ukiah
Site preparation, mobilization and demobilization; remediation system disassembly, removal, and disposal; 120 LF, sawcut existing paving - equipment compound perimeter; 120 LF, remove, haul, and dispose of 6" concrete curb around equipment compound; 650 SF, remove, haul, and dispose concrete slab (6" Thickness) at equipment compound. Includes removal and backfill of grated sump with cdf; 650 SF, asphalt concrete repaving - equipment compound footprint; abandon force main discharge connection; 7 ea, remove, haul, and dispose of removable steel bollards. Backfill with cdf to 6" minus and repave to match existing conditions. See attached file.
Posted Date
Dec 4, 2025
Due Date
Jan 13, 2026
Release: Dec 4, 2025
City of Ukiah
Close: Jan 13, 2026
Site preparation, mobilization and demobilization; remediation system disassembly, removal, and disposal; 120 LF, sawcut existing paving - equipment compound perimeter; 120 LF, remove, haul, and dispose of 6" concrete curb around equipment compound; 650 SF, remove, haul, and dispose concrete slab (6" Thickness) at equipment compound. Includes removal and backfill of grated sump with cdf; 650 SF, asphalt concrete repaving - equipment compound footprint; abandon force main discharge connection; 7 ea, remove, haul, and dispose of removable steel bollards. Backfill with cdf to 6" minus and repave to match existing conditions. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →