Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of New Albin
Work includes approx 220 LF of 6" PVC water main, trenched; 37 LF of 3/4" water service pipe; 1 EA connection to existing water main. See outside link.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Lawler
Construction of a new jordan well and connection of new well to the existing well house, including approx., 100' of water main, well house piping, electrical and control modifications, and chemical feed pumps.
Posted Date
Nov 4, 2025
Due Date
Nov 26, 2025
Release: Nov 4, 2025
City of Lawler
Close: Nov 26, 2025
Construction of a new jordan well and connection of new well to the existing well house, including approx., 100' of water main, well house piping, electrical and control modifications, and chemical feed pumps.
AvailableDouglas County
Project consists of new electrical equipment, relocation of an existing generator to the project site, coordination with NV Energy to install a new electrical service, installation of electrical conduit, installation of a new submersible pump, and other appurtenant improvements. See outside link.
Posted Date
Nov 12, 2025
Due Date
Dec 4, 2025
Release: Nov 12, 2025
Douglas County
Close: Dec 4, 2025
Project consists of new electrical equipment, relocation of an existing generator to the project site, coordination with NV Energy to install a new electrical service, installation of electrical conduit, installation of a new submersible pump, and other appurtenant improvements. See outside link.
AvailableCurry County
1 LS Demolition of existing CMU building, including concrete and foundation; 1 LS Remove existing plumbing, electrical, and mechanical inside well building, coordinate with City on disposal; 1 LS Pre-fabricated FRP Building (6'x6'), including heating and ventilation, pre drawing; 77 SF Concrete foundation for new building, per drawing; 1 LS Gas chlorination system, including two cylinder tanks, scale, monitoring sensors, outputs & alarms, pump, analyzer, piping, and all appurtenance; 1 LS CH 80 PVC piping and connections to existing manifold; 1 LS Electrical including 100A/3P disconnect, TVSS, MPZ, pump starter, 75 LF of circuiting for chlorination system, unistrut rack, and 125 LF of service conduit and conductor; Electric company to disconnect existing service and reconnect new service.
Posted Date
Oct 3, 2025
Due Date
Nov 25, 2025
Release: Oct 3, 2025
Curry County
Close: Nov 25, 2025
1 LS Demolition of existing CMU building, including concrete and foundation; 1 LS Remove existing plumbing, electrical, and mechanical inside well building, coordinate with City on disposal; 1 LS Pre-fabricated FRP Building (6'x6'), including heating and ventilation, pre drawing; 77 SF Concrete foundation for new building, per drawing; 1 LS Gas chlorination system, including two cylinder tanks, scale, monitoring sensors, outputs & alarms, pump, analyzer, piping, and all appurtenance; 1 LS CH 80 PVC piping and connections to existing manifold; 1 LS Electrical including 100A/3P disconnect, TVSS, MPZ, pump starter, 75 LF of circuiting for chlorination system, unistrut rack, and 125 LF of service conduit and conductor; Electric company to disconnect existing service and reconnect new service.
AvailableJordan Valley Water Conservancy District
Work will consist of demolition of existing equipment, installation of a 500 kVA new transformer, metering enclosure, switchgear, and additional items identified within the project drawings.
Posted Date
Nov 3, 2025
Due Date
Dec 2, 2025
Release: Nov 3, 2025
Jordan Valley Water Conservancy District
Close: Dec 2, 2025
Work will consist of demolition of existing equipment, installation of a 500 kVA new transformer, metering enclosure, switchgear, and additional items identified within the project drawings.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis