Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Township of Lower Merion
The work for improvements of the ventilation system (ductwork, equipment, louvers, gas detection and alarm, and appurtenances), includes, but is not limited to, selective demolition; cutting and patching; associated incidental electrical; startup; and restoration.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Philadelphia
Provide HVAC construction for pump station construction and pump replacement.
Posted Date
Oct 10, 2025
Due Date
Nov 20, 2025
Release: Oct 10, 2025
City of Philadelphia
Close: Nov 20, 2025
Provide HVAC construction for pump station construction and pump replacement.
Huntington Sanitary Board
Rehabilitation of the existing 4th street pump station facility including demolition of existing pump station above grade components, internal dry well components, pumping equipment and appurtenances, and electrical control and instrumentation components; modifications to convert the existing dry well substructure to a submersible wet well; installation of new pumping equipment and appurtenances, electrical control and instrumentation components; new control building; standby generator; installation of a combined sewer regulator structure and sewer improvements; and completion of site improvements and restoration.
Posted Date
Sep 16, 2025
Due Date
Nov 20, 2025
Release: Sep 16, 2025
Huntington Sanitary Board
Close: Nov 20, 2025
Rehabilitation of the existing 4th street pump station facility including demolition of existing pump station above grade components, internal dry well components, pumping equipment and appurtenances, and electrical control and instrumentation components; modifications to convert the existing dry well substructure to a submersible wet well; installation of new pumping equipment and appurtenances, electrical control and instrumentation components; new control building; standby generator; installation of a combined sewer regulator structure and sewer improvements; and completion of site improvements and restoration.
City of Krum
Project includes the construction of a 694 GPM firm capacity pump station including chemical and electrical rooms, stand-by generator, electrical service, site improvements, fencing, yarding piping and approx. 5,000 LF of 12" water line. Approx. 4,490 LF 12" PVC Water Line (By Open Cut); 88 SY Concrete Driveway; 439 LF 24" Steel Casing;
Posted Date
Nov 6, 2025
Due Date
Dec 2, 2025
Release: Nov 6, 2025
City of Krum
Close: Dec 2, 2025
Project includes the construction of a 694 GPM firm capacity pump station including chemical and electrical rooms, stand-by generator, electrical service, site improvements, fencing, yarding piping and approx. 5,000 LF of 12" water line. Approx. 4,490 LF 12" PVC Water Line (By Open Cut); 88 SY Concrete Driveway; 439 LF 24" Steel Casing;
AvailableHuntington Sanitary Board
Rehabilitation of the existing 13th street west pump station facility including demolition of existing pump station above grade components, internal dry well components, pumping equipment and appurtenances, and electrical control and instrumentation components; modifications to convert the existing dry well substructure to a submersible wet well; installation of new pumping equipment and appurtenances, electrical control and instrumentation components; new control building; standby generator; installation of a combined sewer regulator structure and sewer improvements; and completion of site improvements and restoration.
Posted Date
Sep 16, 2025
Due Date
Nov 20, 2025
Release: Sep 16, 2025
Huntington Sanitary Board
Close: Nov 20, 2025
Rehabilitation of the existing 13th street west pump station facility including demolition of existing pump station above grade components, internal dry well components, pumping equipment and appurtenances, and electrical control and instrumentation components; modifications to convert the existing dry well substructure to a submersible wet well; installation of new pumping equipment and appurtenances, electrical control and instrumentation components; new control building; standby generator; installation of a combined sewer regulator structure and sewer improvements; and completion of site improvements and restoration.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis