Retrieving RFP details
Release
Close
Brownsville Public Utilities Board
Water Treatment Residuals Removal & Disposal for WTP2 Sludge Drying Lagoon.
B00126-Water-Treatment-Residuals-Removal-Disposal-for-WTP-No
-2-Sludge-Pond-Lagoon-FINAL
Brownsville Public Utilities Board
Work includes water treatment residuals removal & disposal for water treatment plant no. 2 sludge drying lagoon
South Central Connecticut Regional Water Authority
The project includes installation of a lined drying bed at the west river water treatment plant, inclusive of an underdrain system to collect leachate. A pump station is will be installed to collect drying bed leachate and precipitation and pump it up to the existing lagoons. Further, a force main connecting the pump station to the lagoon influent piping will be installed, along with lagoon desludging pumps in each lagoon.
City of Peekskill
2026 Water Treatment Plant Chemicals & Sludge Removal.
Release
Oct 20, 2025
Close
Nov 05, 2025